Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Moving Toward Utility-Scale Deployment of Dynamic Pricing in Mass Markets

Prior studies have shown that dynamic pricing can provide numerous benefits to utilities and customers alike.

A Deployment Strategy for the Smart Grid: From the Generator to the Refrigerator

This white paper describes a coordinated, prioritized and customer-based development strategy for utilities considering the Smart Grid initiative.

A Guide to Transformer Winding Resistance Measurements

Matz Ohlen and Peter Werelius of Megger discuss the unique method of winding resistance measurements in transformers and how they are a fundamental importance to detecting potential mechanical and electrical problems that other methods are unable to detect the field.

Smart Metering for Water Utilities

Should water utilities replace current consumption meters with “smart metering” systems that provide more information to both utilities and customers? This question is being hotly debated in today’s electric utility industry but currently appears to be of less interest in the water industry.

Gene Kim's Practical Steps to Achieve and Maintain NERC Compliance

Gene Kim, CTO of Tripwire, describes seven practical steps owners and operators of the bulk power system can take to meet the mandatory NERC-CIP standards, helping them avoid huge fines for non-compliance and protect North America’s bulk power system.

More White Papers

Marketplace

Trip Wire

Automate NERC Cyber Security Compliance

Reports from Spain Blog

Electric Solar: Reports from Spain


         Subscribe in NewsGator Online   Subscribe in Bloglines

When One Wire Is Enough

Because the reactors are fixed rather than switched, they cannot automatically regulate the voltage.

In the early 1950s, Australia saw a need to expand its electrical network to provide power to the country's agricultural areas. Because the loads were small and spread over a wide area, financial constraints demanded a network that was economical to construct and maintain, as the return on capital investment would take a lot of time. As a result, Advance Energy, New South Wales, Australia, turned to single-wire earth return (SWER) systems, which had been successfully tried in New Zealand several years earlier.

Initially, the loads nourished by the feeders were small. However, over the years, the loads grew and began creating problems for the existing SWER systems. One of the principal problems was greater voltage variation along the line. A common solution to this problem is to build a new three-phase 22-kV or 33-kV backbone feeder through the area, redesigning the existing SWER system into several smaller systems sustained by the new feeder. Although this approach is effective, it can be expensive — particularly for areas where load growth rates are inadequate to justify capital investment on a three-phase feeder.

Step voltage regulators (SVR) provide a more economical solution because they can be inserted in the SWER line to control voltage both under light load and at peak demand. Advance Energy's Deca design, a project in the western part of New South Wales, illustrates the effect of regulator application in a SWER system using the V-CAP software program for circuit analysis.

SWER System Characteristics

SWER systems are significantly different from the three-phase, three-wire and single-phase, two-wire systems commonly used throughout Australia. As the name implies, it is a single-wire distribution system in which all equipment is grounded to earth and the load current returns through the earth. Its loads are light and its lines are long, often causing the current to have a leading power factor.

The main features and components of the SWER system are:

  • System voltage. Typical SWER voltages are 12.7 kV and 19 kV, although they can range from 6.35 kV to 19.1 kV. The 12.7-kV and 19-kV levels are convenient because they are the phase-to-ground voltages of a 22-kV and 33-kV system, respectively, and allow the use of standard hardware and equipment. The industry standard for distribution voltages is ± -6% from a nominal 240 V. This standard established criteria for acceptable voltage limits in specifying and optimizing the location of voltage regulators and determining the maximum load capacity of the system. Studies allowed 2% for low-voltage regulation and assumed the use of 16- and 25-kVA, 19,000-kV/500-250-V transformers with an approximate 4% impedance and taps of ± -5%, 2.5% and 0%.

  • Isolation transformer. The isolation transformer isolates the earth currents (zero sequence currents) of the SWER system from the three-phase main supply feeder. This limits the exposure to telephone interference and allows the main supply feeder to maintain its sensitive earth fault detection protection. The transformer carries all the current of the system, including load current and capacitive charging current. The charging current on long feeders is significant, therefore, the impedance of the unit must be low.

    Originally, the earth return current was limited to 8 A at the isolation transformer to avoid potential step-and-touch problems for livestock and humans. Although this regulation no longer strictly applies, currents still are kept relatively low. The typical isolation transformer sizes are 50 kVA, 100 kVA, 150 kVA and 300 kVA; however, 1-MVA units have been used on several occasions.

  • Conductor characteristics. Line length varies according to customer distribution, with an average SWER feeder length of 60 km (37 miles), although a 400-km (250-mile) SWER system is in operation in one state. Therefore, circuit losses because of the high resistance of the SWER conductors, reactive losses in the isolating transformers and resistive losses in the earthing systems can be up to 100% greater compared to those of a single-phase (two-wire) system serving similar loads.

    Typically, conductors have a small diameter and high strength, and are made of aluminum/steel or steel cable. Sections at the sending end of the line often are 3/4/2.5 ACSR (34mm2 [0.053in2]) or are similar. Tee-offs and lightly loaded sections often are 3/2.75 SC/GZ (17.8mm2 [0.028in2]). These high impedance conductors in long SWER lines can cause the total impedance at the end of the feeder to be 1000 ohms.

  • Reactors for compensation. Charging currents are approximately 0.025 A/km for 12.7 kV and 0.04 A/km for 19-kV SWER systems. These charging currents, although similar to other types of distribution construction, are a concern because of long line lengths and high impedance of the conductors and supplying source. Shunt reactors usually are applied to the line to compensate for the charging current to reduce line losses, provide voltage control and minimize isolation transformer size. Because the reactors are fixed rather than switched, they cannot automatically regulate the voltage.

  • Load densities. Load densities for a SWER distribution system typically are less than 0.5 kVA per kilometer (0.31 kVA per mile) of line with a maximum demand per customer of 3.5 kVA. A large system may supply up to 80 distribution transformers with unit ratings of 5 kVA, 10 kVA and 25 kVA. The load patterns and demands vary greatly from customer to customer and from one season to another; thus, as load growth continues, SWER systems are reaching their technical capability. And with customers keenly aware of supply quality, customer complaints are increasing.

  • Earthing. Transformer earthing must be reliable and have low resistance, requiring frequent testing to maintain its reliability. Poor earthing systems reduce safety and supply quality. The maximum earthing resistances are:

  • A 5-kVA distribution transformer — 20 ohms

  • A 10-kVA distribution transformer — 20 ohms

  • A 20-kVA distribution transformer — 10 ohms

  • All isolation transformers — 2 ohms

SWER vs. Conventional Construction

Although a number of inherent disadvantages are associated with the SWER option (for example, load balance on the primary distribution line, restricted load capacity and the inability to provide a three-phase supply), there are many advantages to using SWER in sparsely settled areas, for instance:

  • A low capital cost — through fewer conductors, fewer pole-top fittings, graded insulation on distribution transformers, and fewer switching and protection devices. Although every new project will vary, savings of up to 30% per customer are common for long, lightly loaded feeders.

  • Simplicity of design, which allows for speed of construction. This particularly applies to the stringing of a single conductor.

  • Reduced maintenance costs, because there is only one conductor and no crossarm.

  • Fewer bush-fire hazards, because conductor clashing cannot occur in high winds.

Application of Voltage Regulators

As load on the SWER system increases, voltage regulation becomes an increasingly severe problem. Compared with three-phase system reinforcement, voltage regulators are an economic choice. Their capital expenditure is minimal, and they provide the control needed for adequate regulation, even at some distance from the sending end of the line.

The SVR is an autotransformer in which the series winding is tapped and equipped with a reversing switch that permits its voltage to add or subtract from the shunt-winding voltage. The voltage regulator, therefore, is able to boost or decrease (buck) the voltage on the load side as compared to the source-side voltage. A control winding senses the load-side voltage and supplies this intelligence to the control, which in turn activates an automatic tap changer on the series winding to raise or lower voltage. A line-drop compensation feature often is added to enable a constant voltage to be maintained at a load center remote from the regulator despite fluctuations in load. Figures 1 and 2 show the single-phase regulator and its schematic.

Darling Electrification Project

Figure 3 shows a diagram of the 19-kV SWER system used in Advance Energy's Deca project. The longest feeder is 161 km (100 miles), with the isolation transformer installed at Bindara Gate. The maximum loading for this line is 157 kVA, supplying 20 primary feeder loads via a radial network that comprises three conductor types — 3/4/2.50 ACSR (34mm2 [0.053in2]), 3/2.75 SC/AC (17.8mm2 [0.028in2]) and 3/2.75 SC/GZ (17.8mm2 [0.028in2]).

Want to use this article? Click here for options!
© 2009 Penton Media Inc.

Most Read

Community

Connecting Solar to the Grid

Electric Solar: Reports from Spain
Rick is joining a U.S. contingent traveling with the Solar Electric Power Association to tour large-scale grid connected solar installations in Southern Spain. Check out Rick’s daily blog and experience the world of solar that is in the here and now.
Read Rick’s Blog, Electric Solar: Reports from Spain

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!

More Webcasts

Jobzone
  • June 2009 Issue
  • May 2009 Issue
  • April 2009 Issue
  • March 2009 Issue
  • February 2009 Issue
  • January 2009 Issue
  • December 2008 Issue

Browse Back Issues