Alexandra “Sascha” von Meier, PhD

Co-Director for Electric Grid Research, California Institute for Energy and Environment, Adjunct Associate Professor, Dept. of Electrical Engineering and Computer Science, UC Berkeley

Dr. Alexandra “Sascha” von Meier is Co-Director for Electric Grid Research at the California Institute for Energy and Environment (http://uc-ciee.org), and Adjunct Associate Professor in the Department of Electrical Engineering and Computer Science at UC Berkeley. She currently studies technical and operational issues related to the integration of high levels of renewable resources in electric grids, particulary through through advanced instrumentation of power distribution circuits that increases their visibility to operators. Her past research has addressed engineering and cultural dimensions of energy technology, including electric power distribution, grid-connected photovoltaics, electric demand response, nuclear power plant operation, nuclear materials management, and green building performance. Her textbook, Electric Power Systems: A Conceptual Introduction (Wiley-IEEE, 2006), has been used in university courses and industry to help explain the complexities of operating the electric grid. An award-winning educator, she regularly presents tutorials on electric power delivery to academic and professional audiences. Sascha received her Ph.D. in energy and resources (1995) and her B.A. in physics (1986) from the University of California, Berkeley. Away from the office, she enjoys cycling, rock climbing and the mountains whenever possible.

Posts in The Grid Optimization Blog view all

New Transmission Construction - Is It Worth the Investment?

It is true that distributed renewables like rooftop solar are growing fast and may come to provide a big chunk of our energy. Still, there are two....More
Connect

Latest News
Dec 2, 2016
Video

ABB transformers - the most reliable and energy efficient on the market

Energy is lost at every step in the transmission and distribution network....More
Latest on T&D How™

Nov 28, 2016
Video
T&D How

BPA Install of Transmission Line: Pole Setting

A crew frames up an H-Frame 115kV Transmission Line Pole in eastern Washington....More
Nov 21, 2016
Video
T&D How

BPA Install of Transmission Line: Hole Digging

A crew blasts and bores holes for 115kV H-Frame wood transmission poles in eastern Washington....More
Oct 13, 2016
Education
T&D World Magazine

Where Can You Go with T&D HOW Videos?

Learn how to participate in the T&D How video series...More
Oct 5, 2016
Video
T&D How

Helicopter Install of Transmission Line Monitor 1

A Transmission Line Monitor (TLM) by Lindsey is installed via helicopter on an AEP transmission line at the ESMO Show in Ohio....More

Transmission & Distribution World Online Buyers' Guide
Featured Jobs

More Jobs >>

Sponsored Introduction Continue on to (or wait seconds) ×