Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

AEP, MidAmerican Transmission Joint Venture Proposes Transmission Plan for Renewable Energy Zones in Texas

Electric Transmission Texas LLC (ETT), a proposed joint venture between subsidiaries of American Electric Power and MidAmerican Energy Holdings Company, have filed a transmission proposal with the Public Utility Commission of Texas (PUCT) for the construction of approximately 1000 miles of transmission lines to support development of the Competitive Renewable Energy Zones (CREZ) in Texas.

At the same time, ETT proposed for consideration by the PUCT and the Electric Reliability Council of Texas (ERCOT) an additional approximately 900- mile, high-voltage, high-capacity backbone transmission system to support long range reliability and customer growth needs facing the state. ETT made the recommendations through the CREZ docket, which will identify specific zones that are targeted for development of generation and transmission infrastructure in Texas.

In November, AEP and MidAmerican announced plans to establish ETT as a joint venture to invest in transmission projects within ERCOT. ETT is currently a wholly owned subsidiary of AEP but will become a joint venture with MidAmerican upon receipt of required regulatory approvals. ETT will operate as a transmission utility subject to the rules and regulations governing ERCOT member utilities. An AEP subsidiary initially will act as project manager for the planning, construction and operation of the transmission lines and facilities for ETT.

"There is a critical need to expand the Texas electric transmission grid," said Calvin Crowder, ETT executive director. "Our proposal includes phased development of a high-voltage, high-capacity transmission backbone for ERCOT that will allow Texas to capture the long-term value of wind energy resources that are located in remote areas of the state and quickly interconnect those renewable resources to the load centers in the south, central and north- central parts of the state. Our proposal takes the process to the next level by also outlining a 21st century vision for the growth of the Texas transmission grid."

The first two stages of the proposal focus on ensuring sufficient transmission capability to meet anticipated renewable energy needs. Stage One would reinforce the ERCOT transmission grid, providing access for up to eight gigawatts of existing and planned renewable energy projects in north and central West Texas. Stage Two would support an additional two gigawatts of renewable energy projects. The combined cost of these two stages is estimated to be approximately $3 billion, with completion of Stage One anticipated by 2012 and Stage Two by 2015, based upon AEP's experience with past transmission projects in Texas.

"The third stage of the proposal, a visionary plan to establish an extra high-voltage bulk power delivery system, is much longer-term in scope and conceptual in nature. Planning must begin now, however, to ensure the future viability of the ERCOT grid," Crowder emphasized.

ETT anticipates filing more details of its plan with the PUCT in April in accordance with the commission's timetable in the CREZ proceeding. According to the CREZ docket procedural schedule, the PUCT is expected to release decisions about the CREZ zones, including outlining necessary transmission investment, in July 2007.

The long-range stage of ETT's proposal, estimated to cost approximately $4 billion, is conceptual and could change significantly as part of the PUCT and ERCOT evaluation process. Definitive paths for the proposed projects have not been determined, and will not be determined without ample opportunity for public input.

"The proposal is not exclusive; other transmission developers will be welcome to participate," Crowder said. "We want active participation and an exchange of ideas with other entities in working to refine this plan over the next several months. The key for Texas is to develop a comprehensive plan with collaboration to avoid transmission constraints and costly overlap in transmission system development.

"Now that the renewable energy developers have indicated the areas of Texas that they believe offer the most potential for renewable energy development, ETT's proposal will reliably link those areas with load centers in the state. ETT can bring needed transmission online quickly by employing the expertise and capital of two transmission leaders," Crowder added.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues