Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP, MidAmerican Texas Transmission Joint Venture Begins Operation

American Electric Power and MidAmerican Energy Holdings Co. have completed the transaction establishing Electric Transmission Texas, LLC as a joint venture to build transmission projects within the Electric Reliability Council of Texas (ERCOT).

The joint venture also was approved to operate as a transmission- only utility in ERCOT by the Public Utility Commission of Texas (PUCT). The PUCT order established rates for transmission service for ETT with a 9.96 percent return on equity. J. Calvin Crowder will head the entity as president, Electric Transmission Texas.

As part of forming the joint venture, AEP transferred approximately $70 million of assets from AEP Texas Central Company to ETT, including a 100- megawatt variable frequency transformer in Laredo that allows reliable power transfer between Mexico and ERCOT.

"We've determined that there is significant value in moving forward with capital transmission investments in ERCOT, given the regulatory mechanisms in place that support timely recovery of that investment," said Michael G. Morris, AEP chairman, president and chief executive officer. "The ERCOT transmission grid has critical expansion needs to ensure reliability, meet growing electricity demand, reduce congestion and support renewable generation. ETT, backed by the expertise of AEP and MidAmerican, both leading utilities in the transmission realm, will help ensure that the much-needed additional transmission infrastructure in ERCOT is brought on line expeditiously."

AEP has identified approximately $1 billion of additional transmission projects within its ERCOT footprint eligible for potential assignment to ETT. ETT will evaluate on a case-by-case basis potential future investment in these projects and anticipates identifying the first projects to pursue by the second quarter of 2008. Those projects not pursued by ETT may be built by AEP independent of the joint venture.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue

Browse Back Issues