Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Allegheny Energy, American Electric Power to Form Joint Venture to Build 765-kV Transmission

Allegheny Energy, Inc. has signed a memorandum of understanding with American Electric Power to form a joint venture company to build and own new electric transmission assets within PJM Interconnection.

Under the terms of the memorandum, Allegheny and AEP will build 765-kV transmission lines and related facilities to link AEP’s Amos substation, near St. Albans, West Virginia, with Allegheny’s proposed Kemptown station in Maryland. The joint venture will build and own approximately 250 miles of 765-kV transmission lines from AEP’s Amos station to the Maryland border. An additional estimated 40 miles of 765-kV transmission line from the Maryland border to the Kemptown substation will be developed and owned by Allegheny.

Based on current plans, the proposed project is estimated to cost approximately $1.8 billion, some of which would be owned by the joint venture, with other portions owned by the respective companies. Allegheny currently estimates that its total investment in the project will exceed $1 billion. The board of the joint venture company will determine the scope of any additional transmission investments.

A PJM study released today indicates that the Amos-Kemptown 765-kV line is the preferred solution for ensuring the long-term reliability of the region’s transmission system. Allegheny and AEP anticipate that the Amos-Kemptown line will be included in the next PJM Regional Transmission Expansion Plan (RTEP) scheduled for release in mid-2007. Once the project is included in the RTEP, the joint venture will seek regulatory recovery consistent with the Federal Energy Regulatory Commission’s declaratory orders made July 20, 2006 for Allegheny’s Trans-Allegheny Interstate Line Project and the AEP Interstate Project. The in-service date for Amos-Kemptown will be determined by PJM, with the earliest possible completion in 2012.

“We stand ready to strengthen the transmission system in accordance with PJM’s findings. Its latest study confirms that further investment is critical to providing dependable electric service and keeping pace with growing demand,” said Paul J. Evanson, chairman of Allegheny Energy. “Joining forces with AEP leverages both companies’ strengths for this essential project.”

The joint venture will operate as a transmission utility and be subject to the rules and regulations of the Federal Energy Regulatory Commission and PJM. It will be managed by a board that includes two representatives from AEP and two from Allegheny. AEP will have lead responsibility for engineering, designing and constructing the 765-kV elements of the project. Each company will provide services to the joint venture for siting, acquiring rights-of-way, regulatory approvals, and operations and maintenance of the project.

Allegheny’s Trans-Allegheny Interstate Line (TrAIL), a separate, 210-mile project scheduled for completion in 2011, would not be part of the joint venture. The agreement also does not preclude either company from pursuing other transmission opportunities in PJM.

Allegheny and AEP expect to execute definitive agreements for the joint venture by mid-2007 and anticipate the joint venture will begin operations in the second half of 2007.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue

Browse Back Issues