Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

The Brattle Group Estimates $50 To $100 Billion Transmission Investment Needed To Meet Renewable Portfolio Standards

Johannes Pfeifenberger, principal and utility practice leader at The Brattle Group, has estimated that $50 to $100 billion in transmission investment will be needed to integrate renewable power onto the existing electricity grid. He discussed these findings during the EUCI Transmission Cost Allocation conference taking place this week in Chicago

Pfeifenberger opened a panel discussion on transmission expansion for renewable energy development by presenting his estimate that satisfying current state-level renewable portfolio standards (RPS) will require transmission investments of approximately $50 billion (with estimates ranging from $40 to $70 billion) nationwide over the next 10 to 15 years. If a 20 percent federal RPS were introduced that required states to meet either the higher of their current RPS standards or 20 percent, transmission investment needs would increase to approximately $100 billion (with estimates ranging from $80 to $130 billion), not including baseline reliability upgrades.

"Without a multi-billion investment on the order of $50 to $100 billion, our nation's transmission capabilities will be insufficient to allow for the integration of enough renewable power sources into the high voltage grid to meet the RPS requirements," Pfeifenberger said in his comments. Uncertainty over cost recovery for these types of regional transmission projects has become one of the most significant barriers to making the necessary investment.

During a separate panel discussion, Pfeifenberger addressed the significant differences that exist in planning approaches between transmission upgrades to address reliability concerns and transmission investments to address public policy and economic objectives. He noted that while the industry utilizes well-established formulaic engineering analyses to diagnose reliability problems on the grid and plan transmission upgrades to address these problems, the attempt to develop a similar approach has backfired when applied to planning projects to relieve transmission congestion and integrate renewables.

Pfeifenberger stressed that effective planning to relieve congestion and address public policy objectives will require the development of a compelling business case in addition to the engineering analyses currently used in the industry. "Developing a compelling business case for a multi-billion dollar investment is a challenge in any industry," he noted. "The challenge is particularly great for transmission planning due to the complexity of cost recovery and permitting challenges, as well as the fact that many large transmission projects offer a broad range of economic benefits that are wide-spread geographically, diverse in their effects on market participants, occur over long periods of time, and can be difficult to quantify."

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue

Browse Back Issues