Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

California's Costs for Coping with Power Grid Bottlenecks Plummet Nearly $200 Million

Good news for the California Grid. Thanks to the ISO’s collaborative efforts with utility transmission owners, market participants, and state and federal energy agencies, the California Independent System Operator Corporation (California ISO) was able to reduce the costs for maintaining grid reliability by $192 million dollars in 2006 as compared to the year before. The savings are associated with actions taken by operators in the ISO control room and include techniques taken to battle bottlenecks on the transmission lines.

Wholesale energy costs, when adjusting for fuel costs, maintained record low levels as they did in 2005, with the average costs for both years representing the lowest in nearly 10 years. Additionally, the California ISO topped its operational performance goals in 2006. Grid operators in the ISO Control Room exceeded industry standards for safe and reliable operation during a year in which California experienced a historical heat storm that drove demand for electricity to record-setting heights.

The results were accomplished with a reduced budget. The California ISO operations and maintenance expenses came in net $1.8 million below the 2006 budget of $133.8 million, which was reduced from a peak level of $171.7 million in 2003.

“All sectors of the electricity industry are working together on key policy issues and that is helping the California ISO achieve savings for the industry,” said California ISO president and CEO Yakout Mansour. “In the past year, more than $3 billion in new transmission investment has been approved by the California ISO Board of Governors. In addition, 1,100 megawatts of new capacity has been installed, which further eases access to the grid.”

With regard to the overall efficiency already achieved, multiple factors influence the costs including the decisions ISO operators make on a minute-by-minute basis and innovation in grid operations engineering. The table below shows the total operator-controlled reliability costs for the past three years. The reduction of nearly $200 million dollars in 2006 comes on top of the substantial reduction achieved in 2005. Reliability management costs include Reliability Must Run (RMR) generation, Out-of-Sequence and Out-of-Market energy dispatches and Minimum Load Cost

For 2007, in tandem with the California Public Utilities Commission’s local resource adequacy procurement process, the California ISO reduced the number of Reliability Must Run (RMR) power plants needed in the future for local reliability. The drop of nearly 60 percent, from 120 units or 9,963 megawatts to 65 units equaling 3,995 megawatts will bring even more dramatic savings to the industry.

Mansour notes that the California ISO posted its best year ever in terms of compliance with Western Electric Coordinating Council operating standards.

“In every category, the ISO operations team not only met the standards—but exceeded them by a substantial margin,” he said. “They accomplished this even during last July’s 1-in-57-year heat wave and thin power reserves. It is a testament to the skill and dedication of ISO operating personnel and all who support them.”

Mansour said the ISO will work with policymakers, regulators and others in the industry to ensure energy challenges of the future will be met. “We will continue to support state policies regarding renewables and conservation and will continue to do so until state targets are achieved,” said Mansour.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues