Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Let's Get the Funding Right

There is no denying that the nation's transmission system needs to be upgraded, modernized and expanded, and economic transmission expansion is a key component to fulfilling that vision. Economic projects relieve congestion, thereby freeing up lower-cost power to displace the higher-cost power that was originally dispatched due to insufficient transmission capacity.

Public policy should be aimed at improving the grid to support a competitive wholesale market. The Federal Energy Regulatory Commission's (FERC's) Order 2000 states that regional transmission organizations (RTOs) must employ a transmission pricing system that will promote efficient use and expansion of the transmission system. The RTOs must also be responsible for planning large-scale regional projects, as these projects will enable the wholesale markets to function efficiently and beneficially.

Currently, the prevailing method across the country for economic project cost recovery is the participant funding model. This model relies on the generation or load cost savings (not applicable to transmission-only utilities), credits or capital offsets from deferred reliability projects, or incremental transmission service revenue to justify construction. The nation needs a funding policy that encourages, rather than discourages, the construction of economic projects.

Nearly every RTO in the country currently has only participant funding available for economic projects. A participant funding regime will create free-rider problems, as the benefits of a large-scale transmission expansion are diffuse and long-lived in nature.

Once an economic project is deemed beneficial by the according RTO, that particular project should be constructed and included in the accompanying regional transmission tariff. Economic projects need a cost-allocation mechanism similar to reliability projects or base-plan-funded projects, for at least the reason that different allocation protocols will create an incentive for parties who stand to be allocated fewer costs under the pretense of a reliability project. These parties will likely protest the validity of the economic modeling process.

Currently, for a reliability project in the Southwest Power Pool, one-third of the project is socialized regionally and two-thirds is socialized amongst benefiting zones based on megawatt-mile calculation. The Midwest Independent Transmission System Operator has a similar process but assigns a 20/80 split, with 80% being allocated to large subregions based on the extent to which they were seen to benefit in the initial analysis.

POSTAGE-STAMP METHODOLOGY

A region-wide postage-stamp methodology needs to be adopted over other more unwieldy approaches. Postage-stamp methodology recognizes that it is nearly impossible to identify the specific beneficiaries of a project when many years of revenue requirements are to be assigned. The postage-stamp methodology will increase the likelihood that more project sponsors will step up to build the needed large regional projects. And the methodology would create one pricing zone, thereby leveling rates across the footprint while improving economic dispatch for load-serving entities.

Transmission expansion provides strategic benefits such as price stability, increased reserve sharing and firm capacity, insurance against contingencies during abnormal system conditions, environmental benefits, reduction of additional energy infrastructure and transmission access for renewable energy resources.

THE IMPORTANCE OF ECONOMIC PROJECTS

There are several key conclusions to keep in mind regarding economic projects:

Conclusion 1: Today's economic project is tomorrow's reliability project. In fact, the difference between the two categories is not always clear, and the debate about “beneficiary pays” can be endless.

Conclusion 2: Don't allow the debate to postpone economic projects to the point that they migrate from “need” to “crisis.” As stated by some RTOs, reliability and economics are inseparable.

Conclusion 3: There is an obvious link between congestion reduction and reliability, so let's stop treating reliability projects as “musts” and economic projects as “wants.”

Transmission expansion is needed. The current economic project cost-recovery methodology will impede any significant transmission expansion. Having no cost allocation for economic projects does not provide the proper incentives to build economic projects. Public policy should be aim to improve the grid to support a competitive wholesale market and thus address economic project cost recovery.

The most logical solution is a state- or region-wide postage-stamp methodology for the high-voltage transmission expansion. The time for change is now.


Carl Huslig is the president of ITC Great Plains.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues