Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Electricity Industry Unites to Restore Transmission Grid

The California Independent System Operator Corp. has terminated the transmission emergency issued at the onset of the tragic Southern California firestorm that ravaged homes and knocked out of service a record number of high-voltage transmission lines. Some customers continue to be affected by distribution-related outages, but the wholesale transmission system is flowing smoothly today.

The California ISO would like to acknowledge the dedicated work performed by scores of utility line workers as they braved severe fire conditions to restore transmission facilities in order for the ISO to re-energize the system. San Diego Gas & Electric and Southern California Edison crews worked day and night, in coordination with the ISO control rooms in Folsom and Alhambra, to get the transmission system functional again. Pacific Gas and Electric also sent its line crews into Southern California to help with restoration.

Disasters of this scale take a toll on all of us, said California ISO President and CEO Yakout Mansour. The ISO was saddened to watch the human suffering and loss of homes that came in the wake of the firestorms, but we are heartened by the industrys strength as it worked feverishly to re-energize the power grid. We also want to thank Southern Californians for conserving electricity during the restoration process, even when their lives were turned upside down.

Since Sunday, Oct. 21, when fires began in seven Southern California counties, more than two dozen different transmission lines have been out of service at one time or anotherincluding the 500-kV Southwest Powerlink, the Pacific DC Intertie, and numerous other lines at the 230 and 138kV levels. On Wednesday, the San Diego area was hanging onto the western grid by only one 230kV line. Over one 24-hour period, several 230kV lines that link Southern California Edison and San Diego Gas & Electric at the San Onofre power plant tripped in and out of service at least 25 times.

Despite the numerous transmission line outagessome lasting almost four daysthe California ISO operators worked around-the-clock to re-route power and dispatch generation to compensate for the loss of transmission.

Contingency plans were put to the ultimate test, said Mansour. And, the good news is they worked. ISO operators were able to maintain reliability of the transmission grid with minimal interruptions to end use consumers.

The California ISO would like to recognize the contributions made by power plant owners who quickly responded to the need for additional generation in Southern California in order to offset the transmission lines that were impacted by the multiple fires spreading across the southland. Emergency power was also supplied by Mexicos Comisión Federal de Electricidad, which was critical to maintaining reliability on Wednesday when San Diego nearly disconnected from the larger western grid.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues