Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

FERC Approves New Reliability Standards for Cyber Security

The Federal Energy Regulatory Commission (FERC) yesterday approved eight new mandatory critical infrastructure protection (CIP) reliability standards to protect the nation’s bulk power system against potential disruptions from cyber security breaches.

These reliability standards were developed by the North American Electric Reliability Corporation (NERC), which FERC has designated as the electric reliability organization (ERO).

“Today we achieve a milestone by adopting the first mandatory and enforceable reliability standards that address cyber security concerns on the bulk power system in the United States,” FERC Chairman Joseph T. Kelliher said. “The electric industry now can move on to the implementation of the standards in conjunction with improvement of these standards in order to increase the security and reliability of the bulk power system.”

Additional actions in this final rule direct the ERO to develop modifications to these reliability standards, via its reliability standards development process, and then submit them to FERC for approval. The modifications directed for development concern various oversight and technical issues pertaining to cyber protections. These include removal of language that allowed variable implementation of standards based on “reasonable business judgment” and a new framework of accountability surrounding exceptions based on technical feasibility.

The final rule also directs NERC to monitor the development and implementation of cyber security standards by the National Institute of Standards and Technology (NIST) to “determine if they contain provisions that will protect the Bulk-Power System better than the CIP Reliability Standards,” FERC said. But FERC did not direct NERC to adopt the NIST standards because that could lead to possible delays in putting into place any mandatory and enforceable standards.

The mandatory reliability standards require certain users, owners and operators of the bulk power system to establish policies, plans and procedures to safeguard physical and electronic access to control systems, to train personnel on security matters, to report security incidents, and to be prepared to recover from a cyber incident.

The eight CIP reliability standards address the following topics:

  • Critical Cyber Asset Identification;
  • Security Management Controls;
  • Personnel and Training;
  • Electronic Security Perimeters;
  • Physical Security of Critical Cyber Assets;
  • Systems Security Management;
  • Incident Reporting and Response Planning; and
  • Recovery Plans for Critical Cyber Assets.

The eight reliability standards were submitted to FERC for approval on Aug. 28, 2006. In December 2006, FERC staff issued a preliminary analysis of the cyber security reliability standards, and allowed for public comment. On July 20, 2007, FERC issued a Notice of Proposed Rulemaking proposing to approve the standards, proposing future modifications, and seeking public comment.

The final rule, “Mandatory Reliability Standards for Critical Infrastructure Protection,” takes effect 60 days from the later of either the date Congress receives the agency notice of the rule, or the date the rule is published in the Federal Register.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues