Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Maryland Commission Urges PJM to Hold Summit to Address Possible Capacity Shortage

As part of the Maryland Public Service Commission’s continuing effort to address Maryland’s potential electricity gap, the Commission asked PJM Interconnection, the region’s grid operator to convene a Regional Reliability Summit “as soon as possible.”

As described in a letter the Commission sent to PJM President and Chief Executive Terry Boston on Oct. 2, 2008, the Summit would provide each state with an up-to-date analysis of potential regional and state-by-state electricity shortfalls, as well as a forum for the affected state commissions and PJM to discuss and potential solutions. The request complements the Commission’s ongoing proceeding (Case No. 9149, also known as the "Gap RFP" case) to determine whether additional capacity is needed in Maryland by 2011-12.

"The Commission recognizes that Maryland is part of a regional grid and that our potential electricity shortfalls will require regional as well as local solutions," said Commission Chairman Douglas Nazarian. "Taking control of our electricity future requires us not only to pursue additional capacity in Maryland, as we already are, but also to work together with other affected States and PJM."

In preparation of the Summit, the Commission asked PJM to prepare a presentation detailing three crucial areas:

(1) the potential region-wide capacity shortfall, beginning in 2011, based on the 2011/2012 RPM base residential auction.

(2) each state’s respective share of the potential capacity shortfall under different scenarios.

(3) the steps PJM could and would take on its own to address actual or foreseeable reliability shortfalls. This information would, the Commission believes, provide each state commission with a current analysis of the potential problems and a concise set of documents Commissioners then could share with Governors and legislators in their respective states.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues