Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

NERC Launches Key Initiative to Address Leading Cause of Electric Outages

The North American Electric Reliability Corp. has released a letter to stakeholders to address the leading cause of electric outages. In the letter, NERC announced a new initiative designed to align a number of ongoing efforts to better address the performance of automated systems that protect infrastructure from damage during severe systems. Known as “system protection,” these automated systems helped cause nearly 45% of category 2 and higher system disturbances in 2007 and have contributed to every major system disturbance since 1965.

NERC's new initiative prioritizes efforts of the most concern, focusing on relay loadability, protection system redundancy, protection system coordination, generator frequency and voltage protective relay coordination, transmission and generation protection system misoperations, and protection system maintenance.

“Widespread outages on the power system are rarely the result of a single factor,” commented Rick Sergel, NERC president and CEO. “Grid operators are faced with many unavoidable reliability risks on a daily basis – from severe weather to unexpected, simultaneous equipment failure. It is therefore critical that we reduce those risks under our control,” he continued. “System protection performance is one such area, along with vegetation management, operator training, and visualization tools – all of which contributed to the Aug. 14, 2003 blackout. The electric industry has made significant strides in each of these areas over the past five years. Today’s initiative seeks to continue those efforts to ensure reliability in the months and years to come.”

Protection system relays are installed on nearly every element of power system infrastructure – from substations to transmission lines to generation plants. Like the circuit breakers or fuses in a home, protection system relays are designed detect problems and open breakers to isolate system components from service during faults (short circuits) and other system conditions to avoid physical damage to the equipment. When they misoperate, these controls can isolate equipment from service unexpectedly or may not isolate equipment when they should. Such misoperations can cause or significantly worsen system disturbances.

“We look forward to working with the electric industry and System Protection and Controls Subcommittee to address these recurring issues, improve protection system performance, and, thereby, limit the scope and severity of future system disturbances,” said Bob Cummings, Director of Event Analysis and Information Exchange at NERC.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues