Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

NYISO Issues 2007 Comprehensive Reliability Plan

The New York Independent System Operators Board of Directors has approved the 2007 Comprehensive Reliability Plan for New Yorks bulk electricity grid. According to the CRP report, planned transmission system upgrades and proposed market-based solutions, if built, will meet or exceed reliability requirements through 2016.

The CRP is an integral element of the NYISOs ongoing efforts to address the dynamic needs of New Yorks bulk electricity power system and to maintain reliable supplies of electricity to New York residents, said NYISO President and CEO Mark S. Lynch.

The CRP report is the culmination of the NYISOs Comprehensive Reliability Planning Process (CRPP), which provides a plan for meeting the reliability needs of the states bulk electricity grid over a 10-year planning horizon.

In response to its 2007 Reliability Needs Assessment (RNA), released in March as the first stage of the CRPP cycle, the NYISO has received viable proposals for market-based solutions to the reliability needs set forth in the RNA.

Following its evaluation of all proposed solutions, the NYISOs 2007 CRP consists of the following actions:

  • Deferring retirement of the New York Power Authoritys Charles A. Poletti generating facility in Queens from 2009 to 2010;
  • Implementing updated plans submitted by the transmission owners, including the addition of a 240 mVar capacitor bank at the Millwood substation, and a breaker replacement at the Gowanus substation;
  • Developing 1800 MW of market-based resources from the 3007 MW of proposed merchant generation and transmission projects. At least 1000 MW should be located in or have unforced capacity delivery rights into New York City. Another 500 MW should be located in the lower Hudson Valley area. The remaining 300 MW could be located anywhere in the state.

The CRP report states that other configurations of resources, such as locating more resources in the Hudson Valley, could also satisfy the reliability needs.

The report also states that, at this time, New York need not implement regulated backstop solutions offered by Transmission Owners or alternative regulated solutions submitted by other developers.

While noting that it has received market-based proposals that are over 1000 MW in excess of the minimum requirements, the CRP report notes that the NYISO does not choose which of the proposed market-based solutions will be built. The developers offering these proposals, along with state siting and permitting agencies, will make those determinations.

The NYISO has identified a number of risk factors that could adversely affect the plan, including the absence of a one-stop siting process, the preference of many market-based generation developers for long-term contracts, fuel diversity concerns, dependence on capacity from neighboring regions, and the potential for additional plant retirements due to pending changes in environmental rules and regulations. The NYISO will closely monitor all risk factors through its planning process.

The development status of proposed market-based solutions are monitored and updated twice a year by the NYISO. If it is determined that the proposed generation and transmission projects will not be available when needed, the NYISO will make that finding in the next RNA, and again will seek market-based and regulated solutions to assure reliability for inclusion in the next CRP.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues