Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

New York ISO Issues Second Reliability Needs Assessment

The New York Independent System Operator (NYISO) Board of Directors has approved the state's second Reliability Needs Assessment (RNA), which identifies bulk electricity grid needs from 2007 through 2016.

The study is the first half of the NYISO's Comprehensive Reliability Planning Process (CRPP), which assesses generation adequacy and transmission reliability in New York over a 10-year planning period. The 2007 Comprehensive Reliability Plan (CRP), which will be published in the fall, will determine whether the reliability needs in the RNA can be satisfied through planned projects and market-driven system enhancements and, if necessary, whether any regulatory - or backstop - projects should be triggered to maintain system reliability.

"The Reliability Needs Assessment is an important tool to recognize potential shortcomings and future concerns about the bulk electricity grid," said Mark S. Lynch, the NYISO's President and CEO. "Identifying those problems and rectifying them now will help secure the reliable, safe supply of electricity to satisfy the needs of all New York consumers today and into the future."

The RNA concludes that, generation and transmission resources on New York's bulk electricity grid are expected to be adequate through 2010. Power deficiencies, primarily in the state's southeast region, could occur by 2011 and become acute by 2016 if expected demand isn't addressed by then.

The need in 2011 is being driven by growth in electricity demand - in excess of two percent per year - in the Lower Hudson Valley and the New York City area, as well as generator retirements and increasing congestion on the transmission system. The need for 2011 can be met by the addition of approximately 250 MW of new resources in New York City or about 500 MW of new resources in the lower Hudson Valley. These resources can come from a combination of generation and/or energy conservation measures located in these regions, or by resources in other areas combined with additional transmission capability into these downstate regions.

For 2012 through 2016, several alternatives outlined in the RNA show there is a need for between 1750 and 2000 MW of new resources, most of which would serve southeast New York. However, those resources could be located outside of that area if combined with a sufficient increase in transmission capability.

The NYISO has asked developers to submit market-based solutions to the reliability needs identified in the 2007 RNA. At the same time, the NYISO has requested from the Transmission Owners regulatory solutions that would be called upon only if market-based projects were not available to meet the need on a timely basis.

In this RNA, the NYISO is forecasting the retirement of several power plants which provide approximately 1,675 MW of generating capacity between 2007 and 2009, including the 888 MW Charles Poletti generating facility in Queens, which is scheduled to retire on Feb. 1, 2009. During that period, the NYISO expects the addition of 1,204 MW of new generation, including 140 MW of wind power on Long Island in 2009.

The RNA was developed within the NYISO's joint stakeholder process, which assures input from regulators and those who supply, transmit and trade energy in New York's wholesale electricity markets. The studies were conducted in accordance with existing reliability criteria of the North American Electric Reliability Corp., Northeast Power Coordinating Council and the New York State Reliability Council.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues