Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PJM Reliability Pricing Model Producing Results

PJM Interconnection's new method of pricing electric capacity is producing the intended results: more demand response, reduced power plant retirements and additional generation. Results of PJM's capacity auction were announced last week.

PJM's Reliability Pricing Model (RPM) auction ensures that enough capacity is in place to keep the lights on for the 51 million people in the PJM region. The most recent auction attracted 1300 MW of new resources. Significantly, 536 MW of demand response cleared the auction. (Demand response is a voluntary reduction in the use of electricity. A key feature of the RPM was the ability of demand response to compete with and to be paid the same as generation.)

"We're seeing an incredible response in just six months," said Andrew L. Ott, PJM vice president - Markets. "We have more than 500 MW of new, additional demand response offered into this auction - that's equal to a power plant, and it's four times the amount of demand response from our first auction in April.

"We had 2,300 MW come from generators that chose to restart closed plants, withdraw requests to retire plants or postpone retirement. We had new generation enter the auction largely through upgrades to existing units to produce more power. These are the results we intended to see from RPM."

RPM sends price signals that attract resources to the areas where they are most needed.

"The RPM auction brought the strongest response in our Eastern and Southeastern Mid-Atlantic areas that are growing urgently short of capacity to maintain reliability," Ott said. "The greatest amount of new resources and generation pulled from retirement was in those areas."

PJM's Eastern Mid-Atlantic area includes all of New Jersey as well as the PECO and Delmarva Power and Light territories. The auction cleared 169 MW of demand response in the area and 2,049 MW of generation previously slated for retirement.

The Southeastern Mid-Atlantic area includes the service territories of Baltimore Gas and Electric Company and Pepco. The auction cleared 309 MW of demand response in the area and 102 MW of generation previously slated for retirement.

PJM's long-standing capacity requirement ensures that there are sufficient resources in place to meet consumers' demand for electricity plus a reserve margin. PJM members that sell electricity to end-use customers must have access to adequate power supplies. They can use generation, transmission or demand response, including energy-efficiency programs. They can meet their supply requirements by owning resources (self-supply) or contracting for them (bilaterals).

In the current auction, the price for capacity in most of PJM was $111.92 per megawatt-day (MW-day). For the two areas with limited capacity resources, actual prices paid by utilities and other load serving entities will be $143.51 per MW-day in the Eastern Mid-Atlantic and $180.58 per MW-day in Southeastern Mid-Atlantic. The RPM allows higher prices for capacity where supplies are short. The prices are for capacity between June 1, 2008 to May 31, 2009.

The RPM auctions procure needed capacity after participants have specified self-supply and contracted (bilateral) resources. As part of the phase-in to the RPM, one more auction will be conducted this year. After that, annual auctions will procure capacity three years prior to the required need to provide opportunity for planned resources to compete to supply the needed capacity service.

PJM's analysis shows that the RPM will yield lower costs overall than the previous model. Ott said that last year's historically low capacity prices could not continue. "We would have faced power shortages in future as demand grew and generation retired and was not replaced with new resources," Ott noted.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues