Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

PJM Regional Power Grid Ready for Hot Weather Power Demand

Power supplies should be adequate this summer in the PJM Interconnection, the nation's largest power grid, which manages the power supply for all or parts of 13 states and the District of Columbia. Peak electricity use in PJM is likely to be higher than last summer's level but lower than the all-time record demand.

"We have the required amount of capacity committed to serve consumers for this summer. System operators both at PJM and our members are prepared to handle the challenges the summer may bring," said Michael J. Kormos, PJM senior vice president - Operations. "However, to ensure reliable power supplies for future summers we'll need additional supply resources and additions to the transmission system."

The projected weather-adjusted highest demand for electricity in summer 2008 is 137,950 MW. PJM has 159,780 MW of committed capacity for the summer.

PJM's Reliability Pricing Model requires generation owners to commit their generation to PJM consumers for a full year. Previously, generators could stop providing electricity in PJM and export power outside the region if a higher-priced opportunity arose.

The Reliability Pricing Model also has secured 4,460 MW of emergency load management for summer 2008. The amount of available load management has doubled compared to last summer. Consumers in load management programs typically receive either a special rate or payments for stopping or reducing their use of electricity under emergency conditions.

Peak demand for electricity is forecast to grow 1.4 percent or 1,850 MW compared to 2007. That's enough power to run a medium-sized city. The weather-adjusted peak in 2007 was 136,100 MW. (The actual recorded peak use was 139,428 MW.)

Peak electricity use in the PJM region is driven by high temperatures. PJM's annual summer pre-seasonal assessment looks at a range of possible conditions to allow for variation in weather conditions. The forecast is based on typical peak weather conditions experienced over the past 35 years. Actual electricity demand will vary as temperatures vary from normal. PJM and its members use the forecasted demand to prepare for the summer.

PJM's reserve margin will be 19.7 percent based on committed capacity. The required margin is 15 percent for this summer. Reserve margin provides a "cushion" of generating capacity to meet unexpected high use levels or equipment problems.

PJM's all-time record use of electricity of 144,644 MW occurred in 2006.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue
  • November Issue
  • October Issue

Browse Back Issues