Meralco Moves Closer to Installing an AMR System
The Manila Electric Co. (Meralco), the largest utility in the Philippines serving 4.3 million customers, will deploy Itron's MV-90 xi software system in the Philippine Islands.
In preparation for deregulation, Meralco is implementing customer load profiling and remote meter reading as corporate strategies for competitive advantage. Currently, load profile data retrieval is done manually on selected customer accounts because of manpower constraints.
Meralco is eager to have the capabilities of retrieving detailed meter data from different brands of meters remotely, anytime, anywhere.
MV-90 xi is a proven solution for interval data collection, management and analysis and can be used as a data collection engine that interfaces to existing data management and analysis tools, or as an end-to-end interval data collection and management solution. MV-90 xi collects meter data from Itron handheld computers with or without radio, as well as from Itron Mobile Collection Systems.
Want to use this article? Click here for options!
© 2012 Penton Media Inc.
Acceptable Use Policy
Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.
General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.
blog comments powered by Disqus
















