Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Texas Commission Rule Requires Utilities to File Storm Hardening Plans

The Texas Public Utility Commission has approved a new rule requiring electric utilities to file storm hardening plans to reduce outages and limit infrastructure damage from weather-related events.

"This rule marks a big step forward," said PUC Chairman Barry Smitherman. "Utilities in Texas must continue preparing themselves and the electric grid so that reliability before, during and after bad weather is maintained."

Utilities are required to file their reports no later than May 1, 2011, and must include vegetation management plans, pole construction standards, post-storm damage assessment procedures and improvements in data collection.

The rule requires utilities to provide annual progress reports and a complete plan update every five years. A special provision regarding priority load service requires utilities to file plans and procedures to reduce the number of outages and reduce the length of outages if they occur.

In 2009 the Texas Legislature passed HB 1831, which directs electric transmission and distribution utilities to annually report to the PUC all storm hardening measures undertaken in areas susceptible to severe weather.

The PUC authorized a study of distribution system hardening by Quanta Technology. The company surveyed 26 utilities in the United States and reported that some utilities either have no storm hardening program or are at the early stages of development.

Quanta noted that power restoration costs from storm damage in Texas since 1998 have totaled $1.8 billion. In addition to major hurricanes such as Rita and Ike in recent years, tornadoes, ice storms and heavy winds also caused major power outages.

The new rule applies to regulated investor-owned utilities outside the grid of the Electric Reliability Council of Texas (ERCOT) and regulated transmission and distribution utilities within ERCOT. It does not apply to municipal utilities and electric cooperatives.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues