Utility to Deploy 22,000 Advanced Meters in Two Years
Lexington Electric (Lexington, Tennessee, U.S.) has begun an initiative to deploy the TS2 advanced metering solution from Cellnet+Hunt to 22,000 meters over the next two years.
Lexington is planning to use the remote disconnect capabilities of the system immediately, and in the future will consider outage management and offering time-of-use pricing to its customer base. A power line carrier (PLC)-based communication technology, TS2 is a full two-way advanced metering system that offers demand-response capabilities, such as load control and time-based pricing, as well as distribution system monitoring and load-profile capabilities.
The utility anticipates a full return on investment in seven years based on reduced meter-reading costs alone.
Want to use this article? Click here for options!
© 2012 Penton Media Inc.
Acceptable Use Policy
Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.
General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.
blog comments powered by Disqus
















