Tdworld 1371 Mmr600
Tdworld 1371 Mmr600
Tdworld 1371 Mmr600
Tdworld 1371 Mmr600
Tdworld 1371 Mmr600

Feasibility Study of Economics and Performance of Solar Photovoltaics at Massachusetts Military Reservation

Oct. 14, 2013
This report presents the results of an assessment of the technical and economic feasibility of deploying photovoltaics systems on a superfund site located within the Massachusetts Military Reservation.

This report presents the results of an assessment of the technical and economic feasibility of deploying photovoltaics (PV) systems on a superfund site located within the Massachusetts Military Reservation (MMR).

The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.17/kWh and incentives offered in the State of Massachusetts, such as the solar renewable energy credits.

According to calculations, MMR can place 8 MW of ballast-weighted, ground-mounted PV systems on the crowns of the three landfill caps and the borrow pit with the PV modules tilted at 30 degrees....(Read more...)

Voice your opinion!

To join the conversation, and become an exclusive member of T&D World, create an account today!