Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Turkey Taps Siemens for Modernization, Automation of Power Distribution Network

In the wake of deregulation of the energy market in Turkey, the Turkish Electricity Distribution Corp. (TEDAS) has awarded Siemens Energy an order to modernize and automate the distribution networks of the Konya and Ankara regions. Siemens is installing a control center with a supervisory control and data acquisition/distribution management system (SCADA/DMS) system for controlling and monitoring each of the two distribution networks. Commissioning is planned for February 2010. The Konya and Ankara regions are the first two of a total of 20 network regions of the Turkish network operator that are to be equipped in stages with network control centers.

“On the strength of a precise analysis of the network operator's requirements and of local factors, market situation and infrastructure, we have developed a tailored network automation solution, based on our engineering expertise and experience, which we are implementing rapidly,” said Ralf Christian, CEO of the Power Distribution Division in the Siemens Energy Sector.

The turnkey automation solution for the two control centers is based on a standard SCADA/DMS for the monitoring, visualization and control of the power distribution network. The UNIX-based software of the SCADA and DMS subsystems is of modular structure, and has a distributed system architecture that allows modifications and adaptations to be made at a later time.

All system, network, remote terminal unit and operator data are administered centrally. For the remote control and monitoring of the switchgear, Siemens is installing a telecontrol system with 268 remote terminal units, which are connected to the master system control center through a UHF-based communication system. Siemens is also delivering the complete protection technology for the two distribution networks, which will involve the installation of about 1600 protective relays in each network. Finally, the order also includes comprehensive training of the network operator's technical personnel.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues