Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Seminar Teaches Fundamentals of Today’s U.S. Electric Power Industry

PGS Energy Training offers an in-depth one-day program that provides a comprehensive and clearly explained understanding of the structure, function and current status of the U.S. electric power industry. The seminar also addresses the fundamentals of day-ahead auction markets, LMP, and how the PJM, New York, Texas and other ISO markets operate.

What the Course Covers:

  1. The structure and function of the electric service system, its terminology and units, and the properties of electricity.
  2. How the North American power grid is structured and how it operates; what the different types of electric generation are and the issues we face; and how control areas, spinning reserves, AGC and economic dispatch works.
  3. Who the key players in the industry are, and why the industry is so difficult to restructure.
  4. The differences between ISOs, transcos, ITCs, RTOs, and ICTs; and what today's ISO/RTO status is by region (Includes a detailed map).
  5. How ISO Day-Ahead auction markets operate, or will operate, in PJM, New York, Texas, California and other markets; what locational marginal pricing (LMP) is, and why it is important; how LMP is applied in the PJM and other ISO markets, and why FTRs, TCCs, CRRs, TLRs, RPM and forward capacity markets are important concepts to understand. (The seminars presented at the Houston and California locations will discuss the Texas and California/Western Power markets respectively. PJM will be summarized at these locations.)

Seminar Agenda

  • The properties and terminology of electricity - current, power, var, voltage, etc
  • An overview of the electric service system, and how it works
  • The pros and cons of different types of electric generation, and how they work.
  • The structure and function of the North American power grid
  • Who the various industry participants are and their roles
  • Why restructuring today’s power markets is such a complicated task.
  • How control areas function, what spinning reserves are, and how the lights are kept on.
  • What happened with the August, 2003 blackout
  • A summary of FERC Orders 888, 889, 2000 and SMD
  • The difference between ISOs, ITCs, Transcos and RTOs are, and where they stand today.
  • What TLRs, ATC, OASIS, pancaking rates, shrinkage and other terms mean.
  • The different types of electric generating units and how the are economically dispatched.
  • The different types of electric transmission service and how it's secured
  • What locational Marginal Pricing (LMP) is and why it's used
  • The difference between auction and bilateral bulk power markets and the pros & cons of each
  • The fundamentals of the PJM, MISO, ERCOT or California market (Depending on seminar location) and the role of LMP
  • How the PJM/MISO/ERCOT/California two-settlement energy and Day-Ahead markets operate, or will operate.
  • The meaning of the terms "RPM" and "Forward Capacity Markets " and why these issues are important.
  • A summary of the key issues of today and where the U. S. electric power industry is headed, including a brief discussion the implications of transmission rates on the building out the power grid.
  • The pros & cons of PJM's RPM generation capacity planning proposal versus MISO's energy-only market-based approach.
  • What PJM FTRs are; their equivalent names in other ISOs, and how and why these financial instruments are used.
  • An overview of the similarities and differences between the PJM, New York, New England, MISO, ERCOT and/or California markets. (Depending on seminar location).

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues