Discuss this Gallery 1

on May 13, 2014

"Wait until they find out that the station as built doesn't match the design drawings!"

Post new comment
or register to use your TDWorld ID
Grid Optimization Blog: Listen Up
Featured Video

North-East Agra: The world’s first multi-terminal, ultrahigh-voltage direct current transmission link

The 800 kV North-East Agra UHVDC (ultrahigh-voltage direct current) link will have a record 8,000 MW converter capacity, transmitting clean hydroelectric power, equivalent to the generation of 8 large power plants, from India's northeast region to the city of Agra, a distance of 1,728 km. The North-East Agra project is ABB’s fifth HVDC transmission link in India.

 

 

Featured White Papers
 
Newsletter Signup
ABB Smart Grid Update

ABB's Gary Rackliffe, Vice President Smart Grid, blogs a North American perspective on smart grid trends and technologies.

» Read More

 

Risk, reliability and recovery. Register now

Sponsored Introduction Continue on to (or wait seconds) ×