Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

B&V Increases Capacity of PG&E's Metcalf Substation

Black & Veatch (B&V; Overland Park, Kansas, U.S.) has completed the engineering, procurement and construction of four single-phase 500/230-kV autotransformers to the existing 500-kV and 230-kV switchyards at Pacific Gas & Electric's (PG&E; San Francisco, California, U.S.) Metcalf Substation in San Jose, California.

The Metcalf Transformer Bank 13 Addition Substation Project has increased PG&E's load capacity and reliability in the growing San Jose and San Francisco areas. Additionally, it has improved system reliability by reinforcing the existing banks, providing a safety net if another bank requires maintenance.

“The unique aspect of this project was the amount of switching and temporary circuit connections and reconnections that had to occur throughout the expansion project in an energized environment,” said Moy Basu, PG&E project manager. “The B&V/Overland Construction Inc. team coordinated all of these activities without a single outage incident or error. This is very important since the Metcalf Substation is a critical hub in the Bay area transmission system, as well as the high-tech Silicon Valley area.”

The project consisted of installing a third bulk power transformer bank with major modifications to the 500-kV and 230-kV switchyards. Throughout the project, the B&V/PG&E team, including subcontractor Tice Electric, achieved a nearly perfect safety record with about 50,000 hours worked and no lost work days. Project design began in July 2001, construction began in February 2002, and the Bank 13 energization was successfully completed on May 24, 2003.

“The Metcalf Transformer Bank 13 Addition is one of several projects meant to improve PG&E's overall power-delivery infrastructure,” said Al Tharnish, B&V project manager.

B&V was chosen for its ability to perform and complete complex projects on schedule and on budget. B&V delivered in both of these areas.
Circle 164 on Reader Service Card or visit freeproductinfo.net/tdw

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues