Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PSE&G Implements Tagout/Lockout Software

Since 1980, PSE&G (Newark, New Jersey, U.S.) has used an in-house-developed software application to help manage its safety-tagging program. Previously, PSE&G created tens of thousands of tags manually each year. Twenty-two years and more than one million safety tags later, the utility finally decided to decommission the old legacy system in early 2002.

PSE&G's electric transmission department had demanding requirements for an automated Lockout/Tagout (LOTO) system. Tagging request work orders had to span geographic, departmental and interstate boundaries. Many jobs would involve intricate switching orders centrally orchestrated from the operations planning group. Safety tagging rules would require strict access rights.

PSE&G evaluated several available safety-tagging systems over a six-month period before chosing a commercial system from Stonebridge Software Inc. (Denville, New Jersey) called WinSTETS. Key requirements in selecting the system included ease of use, built-in safety features, adherence to existing business process rules, flexibility in configuring the system look and feel, and easy migration of existing data.

From the initial proposal evaluation, it took less than four months to final production. All aspects of the safety-tagging process were user configurable and any customization was delivered in a few days. PSE&G completed deployment to more than 50 users at several reporting locations in less than three weeks. Training requirements were minimal, and customer support resolved all problems within 24 hours.

The tagging process for transmission, distribution and generator interconnections is especially complex due to multiple geographic locations on the same request including specific safety rules needing approval. Operator worksheets and tags that previously took up to an hour to prepare, now are routinely created in minutes with the new system. In less than two months after implementing the new system, the three individuals who comprise the operations planning group created and processed more than 1000 tagging request work orders.

WinSTETS is a critical tool for the PSE&G's outage-management process. It maximizes maintenance efforts, reduces outage exposure and ensures reliability. In the first year of operation, PSE&G will save more than US$100,000 with the new LOTO system.
Circle 201 on Reader Service Card or visit freeproductinfo.net/tdw

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues