Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

AESO Closes in on $1 Billion in Investment to Strengthen Alberta’s Power Grid

The Canadian Alberta Electric System Operator (AESO) has filed for a $300 million reinforcement to strengthen the northwestern area of the provincial power grid by 2009. This major project follows on the heels of other approved and planned transmission system enhancements that will see a total of about $1 billion in investments to strengthen Alberta’s transmission system. This investment includes reinforcement of the "backbone" of the power grid between Edmonton and Calgary, strengthening the system in southwestern Alberta, and planning enhancements for the cities of Edmonton and Calgary, and the southeast region of the province.

“These projects and plans, representing nearly $1 billion in investment in Alberta’s power grid are critical steps the AESO is taking toward enhancing reliability and building a robust transmission system that supports the continued economic success of the province,” says Neil Millar, the AESO’s vice President of transmission.

“Our comprehensive plans will see strategic investments to strengthen Alberta’s power grid during the next 10 years to ensure ongoing delivery of reliable electricity for all Albertans,” he added. “It’s the AESO’s job to make sure the required transmission facilities are in place where and when they are needed so that reliable and cost-effective delivery of power continues to meet growing demands in all areas of the province and to facilitate Alberta’s competitive power market.”

The estimated $1 billion in transmission projects would add about $2 on the wires portion of an average residential customer’s monthly bill. These costs are not included on the bill until the facilities are in service.

The AESO developed a staged approach for its preferred option to reinforce the northwest grid after extensive consultation with market participants, and load and generation customers in the region. During its consultation, the AESO developed a number of concepts which were evaluated against reliability and technical criteria, financial analysis and future flexibility to accommodate changing conditions in the region.

“We used a staged approach to this transmission development to ensure that we are prudently and effectively taking care of the immediate, medium and long-term needs of the region,” Millar added. “There is always some level of uncertainty with respect to when and where new generation and load might locate, and so our plans must be flexible enough to ensure that we can accommodate anticipated future scenarios reliably.”

After much evaluation and consultation with area stakeholders, the preferred option was chosen because it:

  • is the most effective solution to address load growth.
  • delivers the best operational performance under a broad range of situations that could evolve in the area with respect to generation development and changes in load.
  • allows for the elimination of between $35 and $45 million in annual transmission must-run payments which are contracts held with area generators to provide power in the absence of adequate transmission lines serving the area.

The first phase of the transmission development includes adding about $33 million in new transformers and capacitor banks by 2007, and building four new transmission lines and associated equipment for an investment of about $263 million by 2009. The second phase of the development is to have a right-of-way acquired, at an estimated cost of $2.5 million, for future transmission developments in the region by 2014. While the 2014 facilities were described in the need application, the AESO is only requesting approval for the right-of-way purchase at this time.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues