Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

SDG&E Begins Constructing Powerloop Around San Diego

San Diego Gas & Electric (SDG&E) this week began construction of the west leg of a 52-mile transmission project that will create a loop around the San Diego, California, region designed to provide more reliability and access to a proposed power plant in the Otay Mesa area.

The Otay Metro Powerloop will connect the cities of San Diego, National City, Chula Vista, Santee and unincorporated areas of San Diego County. Approximately 10 miles of the new line will be underground, with the remaining portion placed on new or existing poles within SDG&E’s utility corridor. SDG&E will work to minimize any disruption caused by construction.

“SDG&E adds about 20,000 new customers a year, and electricity use by our current customers is growing as well,” said James P. Avery, senior vice president, electric, SDG&E. “We need to strengthen our transmission highways to ensure that our customers have the energy they need, both now and in the future.”

The project will cost approximately $210 million and is being funded by all California energy consumers. SDG&E customers will pay about 10% of the total cost. It is anticipated the entire project will take 18 months to complete.

Once the powerloop is operational, SDG&E customers are expected to see significant savings because of improved access to more efficient electricity sources, as well as enhanced ability to route power through San Diego County.

The powerloop will connect the Otay Mesa power project to two electric substations to the north. The west leg of the project will begin construction this week in Linda Vista in areas around SDG&E’s Old Town substation. Construction activities will then proceed south through downtown San Diego. The transmission line will continue south through National City and Chula Vista before swinging east to the proposed power plant.

Construction will take place at several locations along its route simultaneously and the line is scheduled to be in service by the summer of 2007. The California Public Utilities Commission approved the construction of the project and issued an environmental impact report. Several federal, state and local agencies, community groups and individual property owners took part in that process. SDG&E will follow all applicable laws, construction requirements and design guidelines to reduce exposure to electric and magnetic fields (EMF).

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • October Issue
  • September Issue
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue

Browse Back Issues