Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPU Report Calls for New Jersey Utilities to Improve Storm Response Plans

The New Jersey Board of Public Utilities has released a preliminary report on major storm event planning and emergency response by the four regulated Electric Distribution Companies (EDCs). Shortly after Hurricane Irene exited New Jersey, Governor Chris Christie directed BPU President Lee A. Solomon to assess the performance of the EDCs prior to, during and after the storm.

The preliminary report calls for immediate action by the EDCs to improve communications including the addition of staff during storm events to handle expected calls, the use of social media to inform affected customers, and having a full communications plan approved by the BPU in advance. These recommendations are designed to address some of the problems identified during BPU staff’s review of the electric utilities’ responses to Hurricane Irene and the October snow storm. In addition, the report recommends areas warranting further investigation by BPU staff with the assistance of a soon-to-be appointed consultant.

Specifically, BPU recommends improvements in EDC communications with customers, municipal and county officials and Office of Emergency Management (OEM) personnel; acquisition of supplemental crews; prioritization of service restoration; and infrastructure issues affected by vegetation management and substation flooding. In addition, the BPU report recommends the utilities adopt procedures to identify and prioritize service to special needs customers, such as those with health issues and well water dependent customers.

Currently, the state is collecting responses to a Request for Qualifications (RFQ) for an expert consultant. All responses to the RFQ are due by Dec. 20, 2011. A recommendation will be presented to the Board for approval in January.

In the weeks prior to the arrival of Hurricane Irene, which made landfall as a Category 1 hurricane on the morning of Aug. 28, the state already had several heavy rainfalls that saturated the ground and caused rivers to be running high. Rainfall totals from Hurricane Irene totaling between 6 to 12 inches throughout the state caused widespread record flooding that 2 inundated 15 electric substations. Sustained tropical storm force winds covered the majority of the state with gusts up to 75 mph and sustained 70+ mph winds as the eye passed up the coastline. These winds, combined with the saturated ground caused many trees and limbs to fall onto wires. As Hurricane Irene exited the state there was a peak of approximately 930,000 customers without power. Statewide, approximately 1.9 million of the 3.9 million total customers were affected by outages due to this storm at some time during the event. According to the report, PSE&G and JCP&L reported approximately 873,000 and 780,000 customers affected, respectively, while ACE had 273,898 and Rockland Electric had 27,220 affected by Hurricane Irene.

To receive input from the public, elected officials and local OEM officials regarding the EDCs preparations and restoration performance relative to Hurricane Irene, the BPU conducted six public hearings. These hearings were convened in the service territories of each of the EDCs. In addition, three meeting were held with mayors and municipal officials; two meetings were held in JCP&L’s territory, with the third held in PSE&G’s territory. The Board also received numerous letters, calls and emails which were made part of the record and considered as part of this review.

At the hearings, the vast majority of complaints were made with regard to JCP&L’s storm response. To a much lesser extent, complaints involved PSE&G or Rockland Electric. The most predominate complaints concerned communications with mayors and local officials; communications with the public; Estimated Restoration Times (ETRs); prioritization of restoration efforts; infrastructure issues related to system design and/or maintenance; flooding of substations; and, tree damage on the distribution system and effectiveness/ineffectiveness of EDC’s tree trimming practices.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues