Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Hong Kong Continues to Modernize, Expand Distribution Network

After completion of its first supply system expansion project in Hong Kong, Siemens Energy has now received a follow-up order from China Light and Power (CLP), the largest power supply company in Hong Kong. Over the next five years, Siemens will further modernize and expand the medium-voltage distribution network of China’s third largest metropolitan region. China Light and Power supplies around 80 percent of the population of Hong Kong with electrical power. The latest order worth about US$300 million comprises the delivery, installation and commissioning of about 2000 turnkey distribution substations with gas-insulated 11-kV medium-voltage switchgear.

The gas-insulated medium-voltage switchgear that Siemens is to deliver to Hong Kong ready for installation and connection will meet the high supply reliability standards expected by China Light and Power. The switchgear design includes fully welded corrosion-free stainless steel containers. These allow switchgear to operate without maintenance and largely independently of the outside climate at temperatures of 40° C in summer and air humidity of nearly 98 percent. Siemens will equip the approximately 2000 distribution substations with this switchgear design as part of the order. These substations will also supply electricity to the International Commerce Centre currently under construction. 490 meters tall and with 118 floors, the International Commerce Centre – which is scheduled for completion in 2010 – will be the tallest building in Hong Kong and the third tallest building in the world.

In 2001 China Light and Power commissioned Siemens to modernize and expand Hong Kong’s power distribution network for the first time. In the course of this contract, which had a total duration of seven years, more than 2500 turnkey medium- voltage distribution substations were constructed. The order, worth over EUR 250 million, also included the delivery of the transformers and the telecontrol system.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues