Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens to Expand Power-Supply System in Sri Lanka

The Ceylon Electricity Board has placed an order with Siemens Energy to modernize and expand the medium-voltage distribution network of Sri Lanka's capital Colombo.

The order, worth around 31 million euros, includes expanding and modernizing a 33/11-kV transformer substation; the delivery, installation and commissioning of several medium-voltage power-supply installations; and the renovation of the 11-kV distribution network. A new load dispatching center for the capital is also to be constructed complete with control center. Siemens will also train technical personnel locally and ensure that the power supply is maintained while the network conversion project is implemented.

Colombo's power-supply system is being updated to meet the increasingly high standards required for the city's power supply. This will ensure that the more than 600,000 inhabitants living in the port city, which covers an area of more than 37 sq km (14 sq miles) on the west coast of Sri Lanka, will have a reliable supply of energy in the future, too.

As part of this network expansion project, Siemens is delivering 390 air-insulated medium-voltage switchgear panels, 40 compact stations, 30 ring main units, 72 low-voltage distribution panels, and medium- and low-voltage cables.

In addition, Siemens is modifying 175 distribution substations in the urban network to establish the necessary compatibility for a new system for controlling and monitoring the network and for data acquisition.

Siemens will apply its Sinaut Spectrum control system to the load-dispatching center. The equipment for the center includes telecontrol devices, which gather the data relevant for control purposes in 251 substations and pass it on to the control center, where the city's electrical power-supply network is displayed on screens for every operator or as optional on a video panel, including switchgear and their switching state and energy data.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues