Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

TVA Linemen Install Poles in Hard-to-Reach Areas

Back in the 1920s, linemen trekked into the North Carolina mountains by mule to construct a transmission line. Eighty years later, rust was corroding the steel-lattice structures and the line was starting to show signs of age. To improve system reliability, Tennessee Valley Authority (TVA; Knoxville, Tennessee) retired the 69-kV line between Cleveland and Murphy, Tennessee, and constructed a new 5-mile, 161-kV line.

While it had fulfilled its purpose, the old transmission system had reached the end of its life expectancy. At that point, the utility risked the possibility of the towers rusting in two and falling down. To rebuild the line, TVA linemen had to navigate through steep terrain, cross over mountains and find a way to get across government-protected national forestry land without impacting the environment.

The utility faced two options: either do a lot of hand digging and rely on helicopters, or invest in a new construction rig to help cross over the land. The project had a lot of environmental restrictions, and the linemen couldn't rely on traditional rubber-tired equipment to build roads into the U.S. National Forest in Copperhill, Tennessee.

In-Field Demonstration

To complete the job, TVA needed a creative solution. The utility provides power to 159 power distributors serving 8.8 million customers in seven Southeastern states. Oftentimes, TVA linemen work in a wide variety of terrain. Line crews have to travel across the swamps in Mississippi, the mountains in North Carolina and the Smoky Mountains in Tennessee. As a result, TVA needed a type of machine that could handle wet, steep or rough areas without tearing up the land.

The utility began searching for products and technology online and came across a website for a construction rig called the Linecat from Linecat Inc. (Red Bluff, California). To see the equipment in action, the utility invited the company to perform a demo of the machine on an in-field pole change.

TVA expected the job to take several days because of the need for the construction of an earthen platform at the site. However, instead of multiple days, the workers completed the job in four hours from start to finish. During the demonstration, the company changed a wood transmission pole to a steel transmission pole. The workers removed the line, pulled the existing pole, dug the hole and installed the new pole.

The demo also caught TVA's attention because it was done in a rough area without the construction of a platform, road or pad. If the linemen would have tried to complete the same task with a crane, they would have had to build roads to reach the remote area and construct a pad to work in the wet terrain.

About 20 employees from utilities nationwide attended the demonstration and gave positive feedback about the machine's versatility, capability, low ground pressure and environmental friendliness.

When TVA employees first saw the demonstration, they were amazed with the machine but had doubts about the boom. When Linecat unrolled the 80-ft boom, which folds to fit behind the cab, TVA saw it as a great piece of equipment for line work. It became the first utility to purchase the Linecat and put the 830G rig into service on Nov. 12, 2007.

Training Line Crews

After TVA purchased the construction rig, the utility trained line crews on the Linecat and appointed a limited number of special equipment operators to move and locate the rig. Linemen use the rig to dig holes, set poles and, when used as a bucket truck, do work in the air.

On the transmission line project, the linemen loved the fact that they didn't have to dig holes by hand or hang from heli-copters to do the work. While TVA crews still had to use the helicopter, the construction rig reduced the usage by about 50% to 60%.

On the Job

TVA started using the Linecat on the construction of the new transmission line in November and ended in March 2008. The Linecat saved several thousand man-hours on the construction of the new line.

The machine, which is a cross between a crane truck and a bucket truck, is designed to work like a dozer with a boom on the back. To use the Linecat, operators run the machine like a normal crane. By using the construction rig, linemen can dig holes, set poles, anchor crossarms, construct roads, clear brush or lift lines.

Environmental Restrictions

Work on U.S. National Forest land requires adherence to strict environmental regulations, and in most instances, rubber-tired vehicles are not permitted because of the damage they can inflict on the terrain. Tracked vehicles usually are allowed, because they cause less damage to the environment.

The Linecat's specially designed center line drive disperses weight evenly, producing low ground pressure. Thus, it is more environmentally friendly than other tracked vehicles. Because the Linecat is essentially four rigs in one — a bucket truck, a digger derrick, a crane and a dozer with water on board and a wench on the back — it lessens the need for other vehicles, reducing environmental impact. These are some of the reasons TVA chose Linecat and why the utility gained government approval for this project.

Reducing Downtime

Because the Linecat can travel over any kind of terrain, utilities don't need to construct roads to get their equipment into a remote area. For this reason, they can save time and money by spending the time it would take to build a road on constructing a line.

This has come in handy not only on the U.S. National Forest project, but also when TVA crews are working a storm. Rather than building roads and taking a line out of service following a storm, linemen can load a pole onto the machine and head into the area. They can then reconstruct the line in the time that it takes to build a road to get into the location.

Installing Lines in Any Weather Condition

TVA finished the construction of the transmission line in March 2008, but the utility is still using the construction rig on other pole changeouts or new construction projects in rough or swampy areas. The linemen also use the construction rig in rough terrain or in areas where they want to eliminate the need for roads or pads.

The device also comes in handy when TVA does work for residential customers. Linemen can go in and out of customers' backyards without tearing up the land.

By using the Linecat, TVA linemen can get the job done in less time, which allows our utility to be more productive and better serve its customers.


Travis Terry is a transmission construction foreman for Tennessee Valley Authority. wtterry@tva.gov


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues