Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

First Phase of Salt River Project Begins

Arizona’s Salt River Project (SRP; Tempe, Arizona, U.S.), a consortium made up of Arizona Public Service Co. (Phoenix, Arizona), Tucson Electric Power Co. (Tucson, Arizona) and the Santa Cruz Water and Power Districts Association (Santa Cruz, California, U.S.) is finally seeing some light at the end of the tunnel for its proposed 500-kV transmission line, which will run from an area near Palo Verde Generating Station to a new Pinal West Substation in western Pinal County near Hidden Valley, Arizona. Thanks to recent approvals, siting reviews and hearings, it looks like the group may break ground on the first segment in 2005. However, a second segment of the line from Pinal West to the Southeast Valley near Mesa, Arizona, and at least three substations, is moving much more slowly due to population sensitivity issues. Maricopa County, the termination point for the new line, is not only one of the fastest-growing counties in the United States, but it’s also one of the largest in acreage—almost all of which is occupied by at least one resident or business.

Demand Based on Study

After growing concern that many of the new electric generating stations proposed in Arizona were not located near available transmission corridors, a cooperative regional study was conducted by several of the state’s electric utilities, including SRP, the Arizona Corporation Commission and several energy merchants and marketers. The consortium’s new transmission lines and additional substations are based on the results of the Central Arizona Transmission Study (CATS).

Greystone Environmental Consultants Inc. (Phoenix) has been conducting the siting and environmental permitting for the SRP projects, which will span approximately 209 to 241 km (130 to 150 miles) and cost an estimated US$150 million. Alternate route proposals may vary the cost by up to $35 million.

Palo Verde to Pinal West

The first segment of the project consists of building two parallel 500-kV transmission lines that will transport power from the Hassayampa switch-yard near the Palo Verde Generating Station, west of Phoenix, to a new 500/230/69-kV substation located near the Maricopa / Pinal County line. The 88-km (55-mile) section, which has already been permitted, is scheduled to move forward later in 2005 to meet an in-service date of 2007.

Pinal West to Southeast Valley/Browning

A second 500-kV transmission line is planned that will connect the Palo Verde Generating Station to a new substation in western Pinal County near Hidden Valley. The approximately 160-km (100-mile) section includes a new 500-kV and 230-kV transmission lines and substations that will serve Pinal and Maricopa Counties. Subcomponents of the new line include building a new Pinal West Substation in western Pinal County, southwest of the city of Maricopa, and constructing a new 500-kV interconnect with the existing Santa Rosa Substation located south of the Ak Chin Indian Community.

A new Southeast Valley 500/230/69-kV Substation (RS 19) is planned for northwest of Florence, Arizona, in northeastern Pinal County. Depending on route selection, a future Pinal South Substation, south of Coolidge, may be included in the project.

Another substation on the route will be built to accommodate the double-circuit 500/230-kV transmission line northeast of the town of Queen Creek. From the RS 19 Substation, the new 500/230-kV transmission line will continue on to the existing Browning Substation in east Mesa. The SRP consortium’s proposal provides connectivity for several new facilities in Central Arizona to transfer energy to areas where there is customer demand.

California Interconnect

Several generating plants in or near Arizona have excess capacity, while recent energy studies have identified the Southwest coastal region of the United States as having the potential for shortages. Southern California Edison (SCE) is proposing to construct a new 370-km (230-mile) 500-kV transmission line primarily in SCE rights-of-way, parallel to the existing Palo Verde-Devers transmission line No. 1 from California to Arizona. The termination point for SCE’s line is the Harquahala Switchyard located approximately 64 km (40 miles) west of Phoenix.

SCE is also proposing to upgrade four existing SCE 230-kV transmission lines located within an existing 75-km (47-mile) transmission corridor from the Devers Substation to SCE’s San Bernardino and Vista substations. Many stakeholders and benefactors impacted by these large expansion projects are in discussions regarding cost sharing, joint ventures, generation tie-ins and upgrading of converter and substations along specific sections of the route. Several utilities near the proposed route are developing plans to upgrade and/or use the new lines’ capacity, which will generate a considerable number of additional projects as a result of the transmission line projects. l


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues