Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP and Allegheny Energy Announce Progress in Transmission Line Case

American Electric Power and Allegheny Energy, Inc. have announced that updated testimony filed on July 8 in West Virginia strongly supports the need for the Potomac-Appalachian Transmission Highline (PATH).

The new data, filed as supplemental testimony in an application before the Public Service Commission of West Virginia, incorporates new studies by independent grid operator PJM Interconnection recommending the construction of PATH to resolve significant reliability issues on the region’s electric transmission grid. The PATH companies also plan to incorporate the new information into the existing application in Maryland, as well as in a new application to be filed in Virginia in the third quarter.

“Today’s filing reflects our ongoing commitment to provide state regulatory commissions and the public with the most accurate, up-to-date information available justifying the need for PATH,” said Michael G. Morris, chairman, president and chief executive officer of AEP. “We strongly support the open, thorough process in place to review evidence supporting this project, and we’re confident that PATH will be found to be absolutely necessary to maintain a reliable electric system.”

The latest analyses, conducted as part of PJM’s 2010 Regional Transmission Expansion Plan (RTEP), are consistent with previous studies recommending the construction of PATH. PJM evaluated PATH against several alternatives and found it to be the most comprehensive solution to resolve significant voltage-related issues and line overloads that will begin to occur in mid-2015. Among the other alternatives examined, PATH is the only solution that resolves nearly all projected reliability issues within PJM’s 15-year planning period. The new in-service deadline for PATH is June 1, 2015.

“Reliable electricity is vital to our economy, national security and way of life,” said Paul J. Evanson, chairman, president and chief executive officer at Allegheny Energy. “That’s why it’s critical to have a strong transmission system. We’re committed to taking the necessary and appropriate steps to modernize our nation’s electric grid, with PATH as a vital link.”

The supplemental testimony and exhibits filed include updated information on the projected cost of the project. The filing estimates the project cost at $2.1 billion, which accounts for new local and state requirements; minor route adjustments for the overbuilding and relocation of existing transmission lines; changes in design criteria to meet external requirements; and cost increases in labor, materials and services due to the revised project schedule. The original estimate was $1.8 billion. Allegheny Energy’s share of the $2.1 billion total is approximately $1.4 billion, with AEP’s share worth approximately $700 million.

Affiliates of AEP and Allegheny are seeking authorization to construct a 275-mile, 765-kilovolt transmission project extending from the Amos substation in Putnam County, West Virginia, to a proposed substation in Frederick County, Maryland.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues