Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

AEP, MidAmerican Transmission Joint Venture to Develop Two 765-kV Transmission Projects in the Midwest

Electric Transmission America, a transmission joint venture between subsidaries of American Electric Power and MidAmerican Energy Holdings Co., has signed two separate MOUs with Exelon and MidAmerican Energy Co. to develop two 765-kV extra high-voltage transmission projects in the Midwest. The two projects include a series of transmission lines that will extend from the Indiana/Ohio border into Iowa and will establish part of the infrastructure needed to strengthen the Midwest transmission grid and provide Midwest states with access to additional sources of energy, including renewable, non-carbon emitting electricity generation.

ETA has signed an MOU with Exelon to jointly develop 420 miles of 765-kV transmission lines that will extend from the Indiana/Ohio border west across Indiana into Henry County, Illinois. ETA will develop the 104 miles of proposed transmission lines located in Indiana. Commonwealth Edison, a subsidiary of Exelon, will build the Illinois portion of the project. Based on current plans, the entire project is estimated to cost approximately $1.6 billion. The project would be built in phases, likely between 2015 and 2018, depending on the timing of regulatory approvals.

ETA signed a second MOU with MidAmerican Energy Co.  to jointly develop another 180 miles of 765-kV transmission that would extend from the terminus of the first project in Henry County, Illinois, to Louisa County, Iowa, and then to Buchanan County, Iowa. Based on current plans, the total cost of the project would be approximately $650 million. The proposed project is expected to be operational by 2019, depending on the timing of regulatory approvals.

ETA's estimated share of both projects totals approximately $675 million, subject to final routing, design and regulatory approvals.

"As our nation focuses on developing cleaner, more secure sources of power to support our economy and reduce our environmental impact, it is urgent that we build the transmission system required to deliver this power to customers. These agreements are an important step in advancing transmission projects necessary to support the integration of new energy sources and strengthen the overall transmission grid in the Midwest," said Lisa Barton, ETA president.

The projects are the first commercial transmission proposals supported by the recently completed SMARTransmission study, an effort to develop a conceptual 20-year transmission plan for the Midwest. The SMART study was led by ETA and co-sponsored by a group of several Midwest utilities, including AEP, MidAmerican Energy Company and Exelon.

ETA and its project partners expect to file with the Federal Energy Regulatory Commission in the first quarter of 2011 and will seek necessary approvals from state utility commissions in Iowa, Illinois and Indiana, as well as from PJM Interconnection and Midwest ISO. Costs for both projects are expected to be broadly allocated within their respective regions.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues