Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Allegheny Energy Files Proposed Settlement Agreement for Transmission Project

Allegheny Energy, Inc.'s subsidiary, Trans-Allegheny Interstate Line Company (TrAILCo), has filed a settlement agreement with the Federal Energy Regulatory Commission for a formula rate treatment for the proposed TrAIL line and other transmission-related projects. All active parties to the proceeding either support or do not oppose the settlement agreement.

The settlement agreement, which requires FERC approval and would resolve all issues previously set for hearing, includes the following:

  • an incentive return on equity rate of 12.7 percent for the TrAIL project;
  • an incentive return on equity rate of 12.7 percent for the static VAR compensator installed at the existing Black Oak Substation; and
  • a return on equity rate of 11.7 percent, which includes a 50 basis point adder for membership in PJM Interconnection, for any other projects TrAILCo may undertake for which no incentive return on equity has been requested.

Incentive rate treatment is intended to encourage new investment in electric transmission projects that will improve the reliability of electric service. PJM, the regional grid operator for a 13-state area, warns that without TrAIL, the stability of the grid and reliable flow of electricity within the region cannot be reasonably assured. This could result in blackouts, voltage disruptions, and brownouts throughout the mid-Atlantic region as soon as 2011.

In 2006, PJM approved construction of the proposed line. The project includes approximately 180 miles of 500-kilovolt (kV) transmission spanning portions of Alleghenys service territory in southwestern Pennsylvania, West Virginia and Virginia; additional 138-kV transmission lines to address local reliability concerns in southwestern Pennsylvania; and related substation facilities. TrAIL is estimated to cost $820 million.

TrAILCo is seeking regulatory approvals from the utility commissions in the respective states the line crosses.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues