Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Allegheny Energy Seeks West Virginia Authorization for New Transmission Line

Allegheny Energy, Inc. has filed an application seeking authorization to build a new 500-kV transmission line in West Virginia.

Trans-Allegheny Interstate Line Company, an Allegheny Energy subsidiary, filed with the West Virginia Public Service Commission to build the West Virginia segment of the proposed Trans-Allegheny Interstate Line (TrAIL). The application includes the location of the preferred line route in the state. Independent experts concur that without the line, the region could experience blackouts by 2011.

Targeted for completion in 2011, the line will span Alleghenys service territory from Southwestern Pennsylvania through West Virginia to Northern Virginia. Within West Virginia, the line will run about 114 miles, passing to the west of Morgantown in Monongalia County and traversing Preston, Tucker, Grant, Hardy and Hampshire counties before crossing into Virginia. As part of its review, the commission is expected to conduct public hearings for interested individuals to speak about the line.

We determined our preferred route after careful study, which included the analysis of valuable input we received at public open houses, said David E. Flitman, president, Allegheny Power and Trans-Allegheny Interstate Line Company. We urge you to stay informed, keep an open mind and support a thorough, fair review of our plans by regulators.

About 1500 individuals attended Alleghenys 10 informational open houses across the study area for the proposed line. The purpose of the sessions was to show potential routes in the greatest detail possible and collect feedback. The companys routing team heard remarks from residents who scanned detailed aerial photography showing homes and other landmarks, and also considered hundreds of written comments to create the best possible route for the line.

Without the line, the stability of the grid and reliable flow of electricity within the PJM region cannot be reasonably assured. This could result in blackouts, rolling blackouts and brownouts within West Virginia and other areas of PJM as early as 2011. PJM is the regional grid operator.

While the line is critical to the ongoing reliability of the grid, there are other benefits as well, including:

  • meeting the growing demand for electricity.
  • increasing west-to-east transfer capability, making cost-effective generation available to more customers.

Benefits to the West Virginia economy include:

  • expanding markets for local coal.
  • an estimated 700 jobs during the construction phase (2007-2011).
  • the potential for new generation projects, including clean-coal technologies.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues