Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Hearings Conclude for Allegheny Energy's Transmission Line

Trans-Allegheny Interstate Line Co. (TrAILCo), a subsidiary of Allegheny Energy, Inc. has concluded evidentiary hearings in all three states for its proposed high-voltage transmission project.

The most recent hearing, before the Pennsylvania Public Utility Commission, concluded last week. Allegheny expects decisions from regulators in West Virginia, Virginia and Pennsylvania later this year.

PJM Interconnection, the organization responsible for the transmission grid for a 13-state area, warns that without TrAIL, the stability of the grid and reliable flow of electricity cannot be reasonably assured. This could result in blackouts, voltage disruptions, and brownouts. In Southwestern Pennsylvania, Allegheny forecasts potential problems with the local system as soon as 2009.

We stand firmly committed to TrAIL, and were convinced its the right solution at the right time for our customers in Southwestern Pennsylvania, said David E. Flitman, President of Allegheny Power. While we understand the concerns of those opposed to TrAIL, our primary obligation is to ensure that we can provide reliable electric service to our customers. Allegheny and PJM are convinced this line is essential to meeting this important responsibility.

Evidentiary hearings are on-the-record, fact-based proceedings that allow for cross-examination of witnesses and a thorough presentation of all evidence. TrAILCo filed a substantial amount of written testimony to respond to the testimony of other parties, including opponents of the project.

During the hearings, TrAILCo witnesses including a representative of PJM, the grid operator that has directed construction of the line delivered compelling testimony as to the need for the line, the proposed route, and more. TrAILCo experts also effectively countered the testimony of opposing witnesses.

We have offered a convincing case rooted in fact and data showing why TrAIL is necessary to keep the lights on in Pennsylvania, West Virginia, Virginia and elsewhere in the Mid-Atlantic region, Flitman said. Our experts came well prepared to demonstrate the thorough evaluation undertaken concerning the need and route selection for this crucial project.

Allegheny is committed to working with landowners, neighboring residents, business owners and regulators to balance all interests and minimize environmental and land-use impacts.

A 37-mile segment of the 500-kilovolt (kV) line, along with three related 138-kV lines, will specifically address local reliability concerns in Southwestern Pennsylvanias Washington and Greene counties, where demand growth is straining Allegheny Powers transmission system.

TrAIL in Southwestern Pennsylvania will carry power north from the proposed 502 Junction substation near the West Virginia border to the Prexy substation proposed for Washington County. The new transmission infrastructure in Pennsylvania will also include three smaller 138-kV lines, each approximately five miles in length, which will connect the Prexy substation to existing lines that deliver electricity to customers in Washington County.

The other segment of TrAIL in Pennsylvania is approximately one mile in length and will extend from 502 Junction to the Pennsylvania-West Virginia state line, where it will continue across West Virginia to the Meadow Brook substation near Middletown, Virginia. Dominion Virginia Power will build the line from an interconnection point east of Meadow Brook to its Loudoun substation. The 502 Junction-to-Loudoun portion of TrAIL is necessary to meet the growing demand for power in the Mid-Atlantic region and to prevent several existing transmission lines from overloading as early as 2011.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues