Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

American Transmission Upgrading Transmission Line

American Transmission Co., Wisconsin, will soon begin work on the existing transmission line that runs alongside US Hwy. 41 between the Sunset Point Substation, located in the town of Oshkosh, and the Ellinwood Substation, located in the City of Oshkosh.

“The upgraded transmission line will improve electric reliability in the Fox Valley,” said David Hovde, ATC local relations. “We will do our best to keep disruptions to a minimum along Hwy. 41 as we complete the project.”

The work consists of replacing six structures with steel poles on concrete foundations, as well as adding another six new steel poles. In addition, ATC will also be adding a second circuit (i.e, a second set of wires) on the remaining structures on the existing line by replacing the steel “arms” to these structures. This will accommodate the second circuit that will be placed on the 3.8-mile line along Hwy. 41 and across a portion of Lake Butte des Morts. The steel poles need to be replaced to meet newly required height clearances. There will also be some construction activities inside the two substations.

There will be a few periodic lane closures and diversions along Koeller Street to accommodate the construction vehicles and work taking place during the project. The appropriate traffic control procedures, warning and directional signage, and other safety measures will be in place to alert drivers about any lane closures.

This project should be complete, and the facilities placed in service by mid-December 2007.


Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues