Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

American Transmission Co. Submits Power Line Plan to Commission

American Transmission Co. (Wisconsin) has submitted to the Public Service Commission of Wisconsin its application requesting approval of a proposal for a new 345-kV electric transmission line through Dane County between the towns of Middleton and Christiana.

The project, with a cost between $213 million and $250 million, is a critical infrastructure improvement that will:

  • reinforce the entire transmission network in Dane County
  • reduce the threat of future system outages
  • eliminate the need for multiple new, lower voltage transmission lines in the future
  • provide critical power for continued economic development and a growing population
  • benefit the environment by efficiently moving power throughout the county, reducing electricity lost in transit. This results in reduced electricity generation and the fuels needed to produce power

Over the past two and half years, ATC has worked with local residents, community representatives, elected officials and others to gather input and answer questions about the project. “We appreciate the involvement of the public in helping to shape the decisions related to this project,” said Mark Williamson, vice president of major projects. “We look forward to continued public dialogue on our proposal as the PSC begins its regulatory review.”

According to Williamson, the PSC in its analysis makes two distinct determinations. “The PSC will first study the need for the project, including alternative solutions. Once the need has been established and the project is determined to be the optimal solution, the staff will review the proposed route options and render a decision on the project.”

The final routes included in ATC’s construction application follow two basic east-west corridors. These routes, which were announced in August, include a northern route that generally follows the Beltline Highway and a southern route that traverses mostly rural areas offset from county highways. Some variations to the routes provide alternate connections or paths between the two primary routes. Williamson noted that the company did not designate a preferred route in its application. “All the route options have pros and cons. It will be up to the PSC to determine the route that best represents the public interest.”

“Our filing represents the next step in the public process that will culminate with a PSC decision,” said Williamson. “There will be numerous opportunities for public comment, including a public hearing prior to a PSC order, which we hope to receive in early 2009.”

If approved, the company would begin construction in 2010 and place the line in service in 2013. ATC’s application, Docket No. 137-CE-147 is available for viewing in the Case Management section of the PSC’s web site at http://psc.wi.gov. Copies will also be available late this week at Dane County area libraries, and in each municipal and town clerks’ office.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues