Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Regulatory Review Begins on New Wisconsin Project

American Transmission Co.’s application seeking approval to construct a new 345‑kV electric transmission line in south central Wisconsin was declared complete last week by the Public Service Commission of Wisconsin. The determination marks the beginning of the roughly six-month regulatory review of the proposal, which will include engineering and environmental scrutiny and a public hearing.

This application, which was filed with the PSC in May, is the first transmission line proposal within the service area of the Midwest Independent Transmission System Operator (MISO) that is justified on economics. ATC’s projects in recent years largely have been constructed to address weaknesses on its transmission system and resolve reliability issues.

“Although area reliability will be enhanced, the primary benefit of this high-voltage transmission line to the south comes from the ability of utilities to access and purchase cheaper power in the region for their customers,” explained Flora Flygt director of planning for ATC. The proposed power line, called Paddock-Rockdale, will add a connection between the Rockdale Substation in the Town of Christiana in Dane County and the Paddock Substation located in the Town of Beloit in Rock County.

Although the PSC staff has requested a few additional pieces of information from ATC, a “completeness determination” by the PSC means the staff is confident that the information and data contained in ATC’s Paddock – Rockdale proposal will allow the agency to perform a comprehensive analysis of the proposal. “We hope to have a decision later this year or early next year,” said Flygt. “This regulatory review follows two years of analysis by our planners. If approved, this project will complete a connection to Illinois that will allow local distribution companies access to lower-cost power produced in the region.”

Wisconsin has limited transmission line connections to other states, which reduces access to wind energy and lower-cost sources of electricity from other regions. According to Flygt, six of seven scenarios studied by ATC showed that the project would pay for itself over its lifetime. “The new line could yield a 40-year net savings on the low end of $100 million and almost $1 billion on the high end. On an annual basis, the savings could be between $7 million and $125 million. The cost of the project is about $133 million,” she said.

“Timing is important and we’re encouraged by the PSC’s timetable for review. Our in-service target is 2010, which coincides with the expiration of some of the federal market protection for our service area. Supporting a more competitive market for utilities will translate to savings to consumers,” said Flygt.

The regulatory application includes two possible locations for the new 345-kV circuit, and both make use of existing transmission line corridors. If the project is approved, the PSC will select one route for construction as part of its decision.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues