Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

American Transmission Begins Clearance for Right-of-Way for Line Upgrade

American Transmission Co. (Wisconsin) crews are removing trees and clearing woody vegetation within an existing electric transmission line right-of-way between the Saukville Substation and the St. Lawrence Substation (located northeast of Slinger in the town of Hartford). The work, which began the third week in September, is in advance of a project to replace the old structures and wires along the right-of-way.

“It’s been many years since the right-of-way in some areas has been cleared or maintained,” said Mary Carpenter, local relations representative. “We want adjacent landowners to be aware of the extent of clearing that is needed to prepare for the replacement of the old structures. The appearance of the right-of-way in some locations will be significantly altered, and we want neighbors to know what to expect.”

According to Carpenter, right-of-way maintenance is done primarily for electric reliability reasons. “In this case, the clearing is driven by the upcoming construction work. But the removal of trees and vegetation also will ensure the safe and reliable operation of the new facilities for many years to come,” she said. “We are required to meet certain federal standards for vegetation management on our rights-of-way to prevent electric system outages.”

ATC has notified landowners of the upcoming clearing and tree removal, which will begin on the west end of the line near the St. Lawrence Substation and continue through the end of the year, wrapping up in Saukville. A final notification will be made by the forestry company, Wright Tree Service, who will provide a phone number for property owners who may have questions or concerns.

The construction work to replace the 60-year old poles and wires on the existing 138-kV electric transmission line will begin in mid-October as portions of the right-of-way are cleared. This 19-mile corridor needs upgrading to support the additional output from the Port Washington Generating Station when the second unit is placed in service in 2008. The voltage of the line will remain the same at 138 kV when the new facilities are placed in service in late April 2008.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues