Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPA and Partners Strengthen Energy Connection to California, Southwest

New substation and equipment upgrades on high-voltage power lines linking the Northwest and Southwest will allow the two regions to share more surplus energy, strengthening the transmission grid, providing flexibility and allowing the regions to share affordable and environmentally friendly electricity.

The upgrades to the California-Oregon Intertie come as the Bonneville Power Administration is also upgrading and constructing high-voltage transmission lines within the Northwest to support the growth of renewable energy such as wind and ease bottlenecks in the system.

The California-Oregon Intertie is jointly owned by BPA, Portland General Electric and PacifiCorp. BPA owns most of the transmission capacity on this system and operates the COI. The lines have the capacity to carry 4,800 MW but before the upgrades often carried less energy due to operational constraints. These improvements will allow BPA to operate the line at the full 4,800 MW capacity much more frequently.

“Our electric connection to California and the Southwest is very important to us and our transmission customers,” said Brian Silverstein, senior vice president, BPA Transmission Services. “Strengthening that connection will ensure that we can get energy from where it is produced to where it’s needed. It’s as important as ever as thousands of megawatts of clean renewable energy sprout up across the west coast.”

Many customers have sought additional transmission capacity on the Intertie for several years, with pending requests totaling more than 3,000 MW, or the equivalent of three typical nuclear plants. These improvements will provide several hundred more megawatts of firm capacity on the COI and allow BPA and PGE to satisfy some of those requests.

The improvements also benefit the Pacific Direct Current Intertie—another high-voltage line that connects the BPA transmission system to southern California. The improvements will allow BPA to operate that line at its capacity of 3,100 megawatts more often as well.

The added transmission capacity may also help relieve generation oversupply situations such as the one the region just experienced this spring. This year, mild temperatures reduced demand and an abundance of hydro power boosted the supply. In this case, California did not need extra energy from the Northwest and the Interties were not fully utilized. However, the additional capacity could be very helpful during a year with warmer California spring temperatures and less water in the California hydro system.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues