Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPA Proposes Construction of 500-kV Transmission Line

The Bonneville Power Administration is proposing construction of a new 500-kV transmission line to meet increasing demands for electricity along Washington and Oregon’s I-5 corridor. The line would meet growing local and regional energy demands and help bolster the BPA transmission system to accommodate energy deliveries, including wind power. The proposed line, known as the I-5 Corridor Reinforcement Project, would run between a new substation in the Castle Rock area of Washington and a new substation in Troutdale, Ore.

“BPA is committed to meeting local and regional power needs while ensuring a reliable and stable transmission system,” said Steve Wright, BPA administrator. “The region is growing and so is our need for energy, including green energy such as wind. This line would serve both of those needs.”

The transmission system in southwest Washington and northwest Oregon is heavily used and is approaching its capacity as power production and electricity consumption increase. This increased congestion combined with pending requests for firm transmission service and new patterns of electricity use make consideration of the system reinforcement necessary.

The high concentration of industrial, commercial and residential electricity use in Portland, Vancouver, Longview and surrounding suburban cities and towns is creating greater demand for electricity. BPA has taken innovative steps to keep pace with that growth without building new power lines, but the system is becoming increasingly stretched, and adequate electricity is essential to enabling economic growth and reliability.

“BPA and the region have used aggressive conservation measures and technical solutions to extend the use of the existing transmission system to meet growing energy needs,” said Brian Silverstein, BPA senior vice president of Transmission Services. “Now that we’ve used up that margin, it’s time to consider reinforcement activities.”

BPA is starting preparation of an environmental impact statement under the National Environmental Policy Act to aid in making a decision on whether to build a new line and to review potential environmental impacts associated with various possible route options. BPA will hold a series of public meetings this fall to take comments and answer questions about the project and the EIS process. The EIS process is expected to take about two and one-half years.

“We take our charge as responsible stewards of the environment very seriously,” said Greg Delwiche, BPA vice president for Environment, Fish and Wildlife. “An important part of that is interacting with the public to learn more about their transmission line siting concerns and to provide them with information to help them understand the rationale for the proposed line and the siting options.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues