Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BPA Shows Tower Locations for Proposed Power Line

An interactive online map released in November provides the most detailed information yet about the potential design of the Bonneville Power Administration’s proposed I-5 Corridor Reinforcement 500-kilovolt transmission line in southwest Washington.

The new map shows BPA's preliminary designs with tower locations on the existing and proposed new rights-of-way (typically 150 feet wide) for each potential segment of the new line.

The map refines years of preliminary examination of routes for the proposed high-voltage transmission line. The proposed project is needed to resolve a critical electric bottleneck that could otherwise lead to outages in southwest Washington and northwest Oregon as early as 2016. No new 500-kV power lines have been built in the area in nearly four decades, although the area population has doubled.

“We are following up on our commitment to keep the public informed and involved, said Larry Bekkedahl, vice president, BPA Transmission Services Engineering and Technical Services. “We hope these new map details will give people a better idea about how the line would be designed.”

The best way to see the potential power line locations is to look at the interactive Google project map online. In addition, BPA will provide printed copies for anyone without internet access.

“This is a great opportunity for people to use this new information and provide us with more detailed comments about the impacts the towers and line locations may have on them and their property.” said Mark Korsness, BPA project manager. “This preliminary design and the resulting comments we receive will allow us to study the project’s potential impacts in more detail.”

It is important to note that the map is preliminary. Proposed locations could change as BPA learns more about the areas where it has placed proposed lines. It is highly unlikely, however, that any repositioning would involve moving any of the alignments outside the specific land parcels whose owners have already been notified about the project. The interactive map and other project information are available at www.bpa.gov/go/i5.

BPA will now focus on studying the potential impacts on each proposed route segment, which are identified on the map by numbers and letters. That analysis will help BPA link the segments together into one or more route alternatives between the proposed new substations in Castle Rock, Wash., and Troutdale, Ore. This work will lead to identifying a preferred route, which could be announced next fall in the draft environmental impact statement.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues