Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

AutoCAD Map 3D and Autodesk MapGuide Enterprise:

Powerful, Affordable, Open GIS - With open data standards, CAD integration, and a shared API, AutoCAD® Map 3D and Autodesk MapGuide® Enterprise software products streamline workflows and maximize the value of geospatial data seamlessly-from the desktop to the Web.

Designing Energy Services for Commercial and Industrial Customers:

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

Wind Power in BPA Control Area Surpasses 1000 MW for First Time

The Northwest region has reached a major milestone in the effort to include more clean, emission-free energy in its power supply. Bonneville Power Administration reports that, for the first time, the amount of wind power being delivered to customers via its transmission lines has exceeded 1,000 megawatts. That amount of electricity is enough to meet average electricity demand for approximately 680,000 Northwest residences.

"This is an important accomplishment for the region," said Brian Silverstein, BPA vice president, Planning and Asset Management. "Within just a few years, we've seen more wind projects come on line, and BPA has been working quickly to connect the new projects into the regional power grid. States are calling for adding more clean, renewable sources of energy to the region's power supply and reducing greenhouse gas emissions. This is clear evidence that power providers are responding and taking action to address the region's changing needs."

BPA first began connecting wind generation projects to its system in the late 1990s. From that time until fall 2005, the peak amount of wind in the BPA system remained at about 250 MW. The peak amount of wind increased to about 475 MW by December 2005, and, by 2006, it had grown to more than 775 MW. In the last several years, that figure has steadily increased as more wind projects have come on line in the Northwest. This past November, actual wind generation on the BPA system surpassed the 1,000 MW level for the first time

Three states that include many of the utilities served by BPA - Washington, Oregon and Montana - have enacted legislation requiring utilities to phase in additional renewable energy sources over time. The Northwest Power and Conservation Council's Fifth Northwest Power Plan anticipates wind power will play a major role in meeting the region's future demand for electricity. The plan foresees the development of up to 5,000 MW of new wind power over its 20-year planning period. To date, BPA has connected 13 wind projects into the region's transmission grid

Reaching this 1,000 MW milestone is significant because of the challenges involved with integrating wind power into the region's electrical grid. Building new transmission lines and substations is often required to deliver electricity from the new wind projects, which are usually located in remote areas, to customers. And because wind is an intermittent resource „Ÿ power is only generated when the wind is blowing „Ÿ BPA is working with utilities and other stakeholders in the region to develop approaches to effectively manage the variability of wind power to meet consumer demand.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Gene Wolf

IEEE Blog

IEEE PES
Gene Wolf

Thousands of attendees and exhibitors are poised to take part in the biggest event of the electric utility industry, the 2008 IEEE PES Transmission and Distribution Conference and Exposition hosted by ComEd in Chicago. The IEEE Blog is a unique tour of the 2008 PES Expo, updated regularly by Gene Wolf, chairman of the IEEE PES T&D Committee.

Read More

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

Jobzone
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue
  • December Issue

Browse Back Issues