Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

California ISO Board Approves Fresno Area Grid Upgrades

The California Independent System Operator Corp. Board of Governors has approved a series of transmission upgrades required for electric reliability in the Fresno area. The grid improvements will also allow more efficient use of the 1200 MW Helms pumped storage power plant located in the foothills east of Fresno.

The Fresno transmission upgrades include six projects to replace transmission conductors with modern materials that can carry more electricity and a variety of other significant, but invisible, changes to the existing grid in the area. The total estimated cost of these projects is $127.5 million.

“These upgrades help meet the electrical demand in the Fresno area and optimize the use of the Helms pumped storage facility,” said ISO Vice President of Markets and Infrastructure Development Keith Casey.

The Helms power plant provides important versatility because it can pump water uphill at night when electricity is plentiful and generate power the following afternoon when the demand is high.

“The current conditions in Fresno allow only one of the three pumps at Helms to operate overnight during the summer season and this does not meet the expected local area need,” said Casey. “The projects our Board approved today will solve that problem over a ten year planning horizon and allow use of two of the three Helms pumps during the critical summer off-peak period.”

In the longer term, Casey notes additional transmission enhancements may be warranted for the Fresno area to further improve utilization of the Helms pumped storage facility, to help integrate renewable resources and potentially to help move wind power from the Tehachapi region into Northern California. “These options will be evaluated as part of our ongoing comprehensive transmission planning efforts for meeting a 33% renewable portfolio standard in 2020,” said Casey.

California ISO planning staff also briefed the Board of Governors on the 2010 Transmission Plan. The plan, developed with stakeholders throughout 2009 and into 2010, lists 29 projects with a total value of $573 million that the ISO deemed necessary to meet North American Electric Reliability Corporation (NERC) reliability standards. The ISO Board already approved projects in the plan valued at more than $50 million as required by the ISO planning process. Projects valued at less than that threshold do not require specific Board approval.

“The 2010 plan is a road map to continued reliability for the ISO grid,” said Casey. “Every year, we refine our transmission plan and roll new information into it. This 2010 effort is a comprehensive approach to making sure the grid we have today continues to evolve into the grid we will need a decade from now.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues