Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

How NERC CIP and Security Issues Impact Substation Design and Deployment

Read this whitepaper to learn about a variety of security strategies that can be implemented today and how they will enable you to respond to evolving security requirements

Utility Network Design and Data Management:

Autodesk Utility Design and Autodesk Topobase - Combining Autodesk® Utility Design and Autodesk® Topobase(tm) software applications enables utility organizations to harness best-in-class platforms for utility network design and data management.

More White Papers


         Subscribe in NewsGator Online   Subscribe in Bloglines

New 345-kV Line Commences in Central Iowa

In January, MidAmerican Energy (MidAmerica; Des Moines, Iowa, U.S.) began construction on a 201-km (125-mile) transmission line and substation in Grimes, Iowa. Work will include construction of a substation in Grimes, near Des Moines, and a 345-kV line from MidAmerica’s Council Bluffs Energy Center (CBEC) to the Grimes Substation.

The new line will be a 345/345-kV double-circuit bundle T2 conductor (556 KCM) on the first 24 km (15 miles), 345/161-kV double-circuit with a T2 bundle on the 345-kV side and single T2 conductor on the 161-kV side for the remaining 177 km (110 miles). The average structure height will be around 42 m (140 ft) and will be composed of single-shaft steel poles set on anchor bolt foundations. The assemblies will be made of V-string polymers on steel arms.

The L.E. Myers Co., a subsidiary of MYR Group (Rolling Meadows, Illinois, U.S.), was awarded the engineer procure construct contract. Stanley Consulting was retained to perform line design.

Steel Structure

The design calls for steel poles and replacement of most existing wooden H-frame supports with single steel poles. Early estimates are that 27 million lb of weathering steel poles will be required for the job. L.E. Myers, which awarded the tubular contract to Thomas & Betts/Meyer, will manufacture the structures at its facility in Hager City, Wisconsin, U.S., located about 482 km (300 miles) from the line construction project. The lower shipping costs and delivery times have offset the concern for rising steel prices.

Route span and structure configuration includes an average spacing of 274 to 414 km (900 to 1360 ft) in Pottawattamie County and 320 m (1050 ft) spacing in the other affected counties. Near the CBEC, the new line will be mounted on four existing steel lattice towers currently carrying a single 345-kV circuit for about a half mile. For the Pottawattamie County section, where a 345-kV circuit will be added to existing steel towers that are 30-plus years old and carry existing conductor, some refurbishing might be required to ensure that the system is structurally sound and capable of supporting the weight of a second set of 345-kV circuit conductors.

Hamby-Young (Aurora, Ohio, U.S.) is in charge of materials packaging, which includes 6.7-m (22-ft) steel arms and V-connected suspension insulators to support the added 345-kV conductor, protective lightning protective shield wire mounted on 4.3-m (14-ft) steel arms at the top of the poles. Fiber-optic cable also will be mounted on the steel arms to carry communications for monitoring grid performance. During the reconstruction phase, L.E. Myers crews intend to keep the existing 161- and 345-kV circuits in operation when possible to minimize outages.

The 196-km (122-mile) project is the result of a study conducted by MidAmerica, Omaha Public Power District, the Nebraska Public Power District and other joint-owners of the new Council Bluffs Energy Center. It will enhance the reliability of MidAmerica’s transmission network and relieve constraints in and around the utility’s service territory. It will also serve as an outflow connection from the new 790-MW generation facility being built in Council Bluffs.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Blog

Amy Fischbach

The Briefing Room


Amy Fischbach

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

More Blogs

Webcasts

Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

SEE Annual Conference & Trade Show

The Southeastern Electric Exchange celebrates its 75th Anniversary at the PROUD PAST, BRIGHT FUTURE 2008 Conference in New Orleans, June 25-27. The theme uniquely reflects SEE’s history: helping utility members come together to create a culture of professional development, growth, learning, and commitment to quality.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue
  • January Issue

Browse Back Issues