Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

ComEd Begins Massive Effort to Rebuild Transmission System in Tornado-Ravaged Areas

ComEd today began a massive construction effort to rebuild its transmission system in the Streator and Dwight areas in Illinois after a tornado Saturday inflicted the most significant damage on the utility's system in six years.

The company restored all of the nearly 20,000 customers affected by this storm system early Tuesday morning. This includes 8,400 customers directly affected by the tornado, but work to rebuild the transmission system is expected to last multiple weeks. This will include restringing 34 miles of transmission line, replacing six twisted transmission towers and making significant repairs to a seventh tower.

"Our crews did a phenomenal job restoring all customers in just over two days," said ComEd President and Chief Operating Officer Anne Pramaggiore. "We are committed to restoring the system to the same high-level of reliability residents and businesses experienced prior to the tornado."

The extensive destruction in and around Dwight and Streator included uprooted trees, broken poles, and damage to seven transmission towers and two distribution substations that served large portions of the area. More than 100 crews came from as far away a Rockford and Libertyville to work around the clock to replace about 120 poles and 25 miles of overhead power line, and restore all customers to service. However, complex repairs to the transmission towers will require weeks to complete given the severity of the damage and importance of these lines in carrying electricity to millions of customers throughout Illinois and beyond.

When the transmission towers collapsed, this pulled on the transmission lines creating great tension that still exists on the lines. Great care will be needed during reconstruction to avoid the lines pulling on and damaging other towers and lines. Once the damaged towers are rebuilt, ComEd will conduct detailed inspections on all area towers to ensure that they were not affected by the storm.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues