Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Study: Southwest Power Pool Project Would Save $2.8 Billion Annually

CRA International, Inc. is preparing a study about the economic benefits if approximately 1,200 miles of extra-high voltage transmission are built in the Southwest Power Pool. The Southwest Power Pool (SPP) manages the transmission system in all or part of Arkansas, Kansas, Louisiana, Missouri, New Mexico, Oklahoma and east Texas outside of the Electric Reliability Council of Texas. The study, titled First Two Loops of SPP EHV Overlay Transmission Expansion, Analysis of Benefits and Costs, reveals the economic benefits of building the proposed extra-high voltage transmission in the region outweigh the costs. It was prepared for Electric Transmission America, LLC (a joint venture of subsidiaries of AEP and MidAmerican Energy Holdings Company), Westar Energy and OGE Energy Corp.

The study evaluated a SPP proposal to build approximately 600 miles of 765-kV lines in western Kansas and Oklahoma by 2014 and another 600 miles of 765-kV transmission in the Texas Panhandle and Oklahoma by 2016. The study concluded that:

  • Building the projects would save approximately $2.8 billion in annual power supply costs throughout SPP by enabling development of more than 14,000 megawatts of renewable wind generation, which is enough to supply 20 percent of SPPs electricity demand.
  • The 14,000 megawatts of renewable wind generation that would be produced would eliminate 30 million tons of carbon dioxide emissions annually.
  • $100 million in benefits would be realized by reducing line losses (electricity loss during transmission).
  • Construction of the wind generation and transmission lines would result in more than 10,000 construction jobs, 5,000 permanent jobs and more than $60 million per year in property taxes.
  • The transmission projects will provide net economic benefits of more than $600 million per year.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues