Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

DOE Official Touts Bush Administration’s Efforts to Modernize Nation’s Electric Grid

The U.S. Department of Energy’s newly confirmed Assistant Secretary for the Office of Electricity Delivery and Energy Reliability Kevin M. Kolevar today highlighted the Bush Administration’s efforts to increase the use of advanced technologies in the nation’s power delivery system equipment, as well as DOE’s recent announcement to invest up to $51.8 million to modernize and secure our nation’s electric grid. Kolevar visited the Entergy Louisiana Operations Center in Gretna, Louisiana. The Entergy Corp., DOE’s Oak Ridge National Laboratory and nkt cables of Germany joined the Southwire Company’s team, which was selected by the DOE in June to receive up to $13.3 million to install a high-temperature superconducting cable to solve real-world electrical congestion near downtown New Orleans.

“As demand for electricity continues to grow, so too must our commitment to identify solutions and deploy new technologies that will help us realize President Bush’s goal of a modern, reliable and affordable electricity system,” Kolevar said. “New Orleans understands first hand the importance of a safe and reliable supply of energy. The Department of Energy is tremendously pleased to support Southwire and Entergy’s innovative project to help transform how this city transmits power.”

The Southwire power delivery project will install a 13.8-kV superconducting cable to connect the existing LaBarre and Metaire substations, owned by Entergy Corp., a member of Southwire’s project team. This project will advance the development and application of high-temperature superconductors, which help to alleviate congestion by transmitting more electricity with greater energy efficiency. Superconductors - solid ceramic compounds that conduct electricity more efficiently than traditional copper wires - can be a key to improving the capacity, efficiency, and reliability of electric power equipment. A major challenge prior to commercialization is to develop superconductors that can operate at relatively “high” temperatures, from approximately -320 to -370 degrees Fahrenheit (50 to 77 Kelvin), and in magnetic fields from 1 to 4 Tesla.

The Southwire Co. was among four other consortia selected by DOE to receive a total of up to $51.8 million for cost-shared projects that will help accelerate much-needed modernization of our nation’s electric grid. Other companies selected by DOE to receive funding are as follows: American Superconductor - (DOE cost share: $9 million); American Superconductor - (DOE cost share: $12.7 million); SC Power Systems - (DOE cost share: $11 million); and SuperPower Inc. - (DOE cost share: $5.8 million).

The selected projects will help advance the future generation of power delivery equipment and aid the development of a highly efficient electricity grid system for the Nation. Two research projects selected will help increase reliability and efficiency of power delivery cables, and the remaining three projects will place an emphasis on fault current limiters. DOE’s National Energy Technology Laboratory will manage these projects, which are expected to last two to five years. Projects will be equally cost-shared between DOE and selected teams, totaling $103.6 million in DOE/team project cost. DOE funding is expected to be allocated in Fiscal Years (FY) 2007-2012, subject to appropriations from Congress, with $10 million from FY2007, and $7 million requested in FY2008.

DOE’s Office of Electricity Delivery and Energy Reliability (OE) will oversee the research projects announced today. OE leads national efforts to modernize the electric grid; enhance the security and reliability of the energy infrastructure; and facilitate recovery from disruptions to the energy supply.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues